Laserfiche WebLink
_ . _ <br /> u~-.~~~.,y <br /> also address the iossible a roaches for contracting the construction and o aerations s ec~ <br /> F PP ~ 1 p i5cally ro <br /> meet the County's projectschedule. <br /> F3ascd on the kick-off mcctiue and TM results, the consultant will prepare up to five alternative <br /> layouts. The layouts will consider vehicle movements, building sizes, storage and surge capacities. <br /> waste handling methods, and personnel facilities. Requirements for the Resource Park will also be <br /> presented. The design will incorporate environmental characteristics such as use of rec~~cled <br /> building materials to the degree practical and cost effective. <br /> The preliminary layouts along with the construction costs associated with each layout will be <br /> presented to the County for Iheir review along wish the advantages and disadvantages of each <br /> alternative. After the County's comments ?nd suoeestions are received, the consultant will prepare <br /> a preferred alternative which will be the basis for the Detail Design phase. <br /> The TM and preferred alternative will also be important products for the County m the <br /> Em~ironmental Impact Statement requirements. <br /> Task 5.3: Meeting and Review <br /> The consultant will meet with the County to discuss the five alternatives along with a cost estimate <br /> and project schedule. <br /> Deliverables: <br /> • Minutes of kick-off meeting <br /> • Technical Memorandum <br /> • 3 - ~ alternative layouts <br /> • Preferred alternative <br /> Phase II-Detailed Desig? <br /> Objective: Prepare detailed designs, drawings and specifications necessary to obtain proper bids <br /> for construction. Also obtain all necessary building permits. <br /> Task 5.4: Prepare Detailed Design and Operations Plan <br /> Prepare detailed civil (including landscaping), structural, mechanical and electrical designs and <br /> drawings for the following: <br /> • Roadways, maneuvering and parking areas <br /> • Utilities (water, storm, and possible sewer) <br /> • Power supply and distribution <br /> • Site lighting <br /> • Erosion control <br /> • Fencing <br /> • Landscaping <br /> • Transfer building <br /> • Resource Park <br /> • Truck wash <br /> • Office/.'isitors/personnel facilities <br /> • Scales and scalehouse <br /> ?,n operations plan will be included based on decisions made by the County as to public or private <br /> operations. As the design progresses, the consultant will issue documents for the County's review <br /> at the ~0% and 90% completion phases. <br /> Task 5.5: Prepare Technical Speciticalions <br /> <br /> Count~~ o(Hz~raii Scope of Work p. 9 ?/7/03 <br /> Pull DesiKn and Procurement Srrvices <br /> <br />