Laserfiche WebLink
Prepare lecltnical specifications fix all construction per the CSI format. The "front end" <br /> documents can also be supplied by the consultant; or ice can utilize documents h~eh the Counh~ <br /> has utilized from past projects. <br /> Task 5.6: Prepare new construction cost estimates, project schedules and bidders Lst. <br /> Task ~.7: hleztings and Constnictability Review <br /> Conduct a constnictability revie~+~ to ensure constnicuon efficiencies can be realized b}~ the <br /> C ounty. <br /> Consultant will ohtam building perniits, wiflr filing fees paid by the County. All drawmes and <br /> specifications will be prepared on AutoC:4DD Vcrston 2000 and ISIS Word respectively. <br /> Electronic disks will be provided for the County's use. <br /> Deliverables: <br /> • Derail dzsign drawings at 50% and 90% eomplztion phases <br /> • Final construction drawings and specifications <br /> • Engineer's estimate for construction costs <br /> • Building permits <br /> Phase III: Resource Utilization RFP <br /> Objective: Develop a procurement process for contractors who will manage materals for <br /> diversion from landfill. <br /> 't'ask 5.8 Przparahon of Request for Proposal for Resource Utilization Services <br /> Consultants will prepare the Request for Proposal (RFP) for the operations at the new Resource <br /> Park to be located on the SSS site. The purposz of this RFP will be to solicit proposals from <br /> pnvate companies for the processing oC individual waste streams of recyclable materials. It is <br /> expected thaT the proposals will be for individual waste streams and local businesses will qualify <br /> for favorable enteria for selection. <br /> Deliverables. <br /> Draft Resource Utilization RFP for review <br /> • Pinal Resource Utilization ItPP <br /> Phase IV: Services during Bidding and Construction <br /> Objective: Provide engineering and construction inspection services during construction. <br /> Task 59~. Pre-Bid and Pre-RFP (\4eetings, Answer Questions and Review Bids. <br /> Consultant will attend pre-bid and pre-RFP meetings, which should be scheduled in close <br /> proximity, and ans~a~er any reclmical questions during the btddmg. Consultant will also asstst the <br /> County in preparation oCaddenda (if required). <br /> Consultant will assist the County in review of bids and proposals and make recommendations for <br /> award. <br /> Task 5.10: Pre-Construction Meeunu, Review Submittals and Field Visits. <br /> Consultant will attend the preconstruchon meeting, and review all technical submittals and Vendor <br /> data for conformance to drawings and specifications. Consultant wtll answer all RFIs, review <br /> change orders and payment requests. <br /> Consultant will provide periodic field vistts at key points in the constructOn to moniror <br /> conformance to drawings and spec~ficalions, Participate in the tlnal punch lists and inspection. <br /> For budgeting purposes, consultant has assumed weekly site visits from our Honolulu office. <br /> <br /> County of Hawaii Scope of A1'ork p. 10 ?/7/03 <br /> Full Design and Procu remenf Services <br /> <br />