Laserfiche WebLink
the former Pepeekeo Sugar Co. building which was built in 1919, according to the sign <br /> on the building. The developer has elected as a, in a future application to come back to <br /> the County for rezoning to Mixed Use Commercial and Industrial which would allow, <br /> hopefully, commercial and office uses in that area, out of the building primarily. There is <br /> an existing County General Plan Industrial designation spot down in that area to reflect <br /> the HCPC mill and we'll be making that application in the future. But, however, for this <br /> particular go-around, the requirements to the settlement agreement provide that we <br /> should take it down to Residential-20,000 square feet. <br /> Moving on to the next slide, to give you some views, sorry that these are not coming out <br /> real The gray shading on the overhead is turning, of course, our colors into purple. But <br /> essentially we have, this is views of the project looking from the south border of the <br /> property looking back towards the mauka and west side of the project. If you are familiar <br /> with the area, as you look down from the highway, you'll see the County's wastewater <br /> treatment plant down there on the south side; and in the middle of the project you'll see <br /> the Industrial uses at the HCPC plant. <br /> As you can see from the photo, what I've tried to do, although I can't be sure because this <br /> is a very old photo and things may have moved, is in the pink, outlined in the pink on <br /> your map is the area that we're talking about for the SMA and Change of Zone areas. <br /> Moving on to the next photos, if, on photo number 12, if you could see, you can't see it <br /> real good. But if we could see it, this is a view from the middle of the project <br /> approximately on the Mill Road looking in the south direction towards Hilo. <br /> Moving on to the next slide, these we can't sec, I think. What we'll try to do is, <br /> essentially the, I'll try to use the photo that you do have in front of you. It's, the project <br /> area has long been cleared of most of these buildings. And the urban area that we're <br /> going in for the SMA and the rezoning is right around that Pepeekeo sign. That's now all <br /> essentially demolished, it's overgrown with grass; and the topography in that area is <br /> generally flat, with the cxccption of the foundations of the buildings. <br /> The public access for the project, as a whole, contemplated, like I say, five separate <br /> mauka-makai public acccssways. And you can see briefly from the size that you'll be <br /> able to make out the shoreline areas, for the most part, relatively high cliffs with the <br /> cxccption of the areas near the lighthouse at the Pepeekeo Point. <br /> <br /> The developer has reviewed the conditions proposed by the Planning Director. And <br /> <br /> we've reviewed the Background Report, and we have no comments and agree with the <br /> <br /> Recommendation for approval. The condition regarding the setback of structures away <br /> from the edge of the cliff, even though the certified shoreline might be closer down, is <br /> <br /> acceptable to the Applicant. We think that the, essentially, this is a reordering of what <br /> <br /> the former uses at the Pepeekeo Point used to be. We'd ask the Planning Commission for <br /> <br /> its favorable consideration, and we're open for any questions. Thank you. <br /> 6 <br /> <br />