Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> Current Plans: <br /> <br /> Engineering Consultants under contract with the County is collecting field data and will analyze <br /> the information to derive conceptual sewer system designs and estimated construction costs to be <br /> compiled in the draft Preliminary Engineering Report (PER). <br /> <br /> Upcoming Plans: <br /> <br /> The County will schedule public meetings for each community in June 2006. Purpose is to <br /> present conceptual public sewer system designs and project timeline as described in the draft <br /> PER report. The private connection plan is not a part of the County design process. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> 4/18/06 <br /> 2 <br />