Laserfiche WebLink
<br /> 4/15/97 Page 2 <br /> PAPAIKOU WASTEWATER SYSTEM <br /> FLOW COMPLIANCE SUMMARY <br /> EPA REQUIRES TOTAL FLOW OF 75% DESIGN FLOW (t,~( y~!~ry y~~ <br /> ~ ~77~ a <br /> ~i <br /> 9 i." i" , ~ ran~,~., ~...3. ~ Leo e, r .'t"'e;.. r^ne"... ~ <br /> PROJECTION INCLUDING KAAPOKO EXTENSION <br /> AcWal Existing 226 442 0.10 <br /> Papaikou Phase II 38 442 0.02 <br /> PaukaaPhaseII 123 442 0.05 <br /> Kaapoko Extension 24 442 0.01 <br /> TOTAL PROJECTION: aI i 442 015= ~ <br /> PROJECTION WITHOUT KAAPOKO EXTENSION <br /> Actual Existing 226 442 0.10 <br /> Papaikou Phase II 38 442 0.02 <br /> Paukaa Phase Ii 123 442 0.05 <br /> Kaapoko Extension 0 442 0.00 <br /> TOTAL PROJECTION: 3s~ aa2 0.17: '~j`~'1% <br /> Average Flow (442 gpd/unit) is based on Existing Flow (0.10 mgd) divided by Existing Connections (226) <br /> Revised Kaapoko <br /> <br />