My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0307.000 2006-2008
ClerkCouncil
>
Council Records
>
Communications
>
2006-2008
>
COM 0307.000 2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2008 4:55:59 AM
Creation date
5/8/2008 5:30:35 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2006-2008
Communication
0307
Point
000
Author
Harry Kim, Mayor
Communications - Referred To
COUNCIL
Comments
Council: Close file - 5/02/07
Document Relationships
AGE COUNCIL 2007/04/18 2006-2008
(Related)
Path:
\Council Records\Agendas\2006-2008\Council
AGE COUNCIL 2007/05/02 2006-2008
(Related)
Path:
\Council Records\Agendas\2006-2008\Council
AGE PC 05/01/2007 2006-2008
(Related)
Path:
\Council Records\Agendas\2006-2008\Plannning Committee (PC)
BIL 318 Draft 01 2004-2006
(Related)
Path:
\Council Records\Bills\2004-2006
COM 0307.001 2006-2008
(Related To)
Path:
\Council Records\Communications\2006-2008
COM 0307.003 2006-2008
(Related To)
Path:
\Council Records\Communications\2006-2008
COM 0307.004 2006-2008
(Related To)
Path:
\Council Records\Communications\2006-2008
COM 0307.005 2006-2008
(Related To)
Path:
\Council Records\Communications\2006-2008
COM 0307.006 2006-2008
(Related To)
Path:
\Council Records\Communications\2006-2008
COM 0307.007 2006-2008
(Related To)
Path:
\Council Records\Communications\2006-2008
COM 0307.008 2006-2008
(Related To)
Path:
\Council Records\Communications\2006-2008
COM 0307.009 2006-2008
(Related To)
Path:
\Council Records\Communications\2006-2008
COM 0307.015 2006-2008
(Related To)
Path:
\Council Records\Communications\2006-2008
COM 0307.016 2006-2008
(Related To)
Path:
\Council Records\Communications\2006-2008
COM 0307.017 2006-2008
(Related To)
Path:
\Council Records\Communications\2006-2008
COM 0307.019 2006-2008
(Related To)
Path:
\Council Records\Communications\2006-2008
COM 0998.000 2004-2006
(Related)
Path:
\Council Records\Communications\2004-2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(31 The TIAR shall include proiections for future growth in traffic, for a minimum <br /> <br /> of five years, and shall include other approved development in the area, with reasonable <br /> <br /> assumptions about the build-out of such development. <br /> (4) In lieu of requirine the TIAR to assess the general traffic level on arterial and <br /> <br /> collector roads serving the project area, the director may determine that the current traffic <br /> <br /> level is worse than the acceptable level of service based on other available studies. <br /> (e) Mitigation Required. <br /> (1) If the LOS for any public road or intersection in the study area is (11 currently <br /> <br /> worse than the acceptable level of service, or (2) proiected to become worse than the <br /> acceptable level of service during the five year period, any rezoning of the property, if <br /> <br /> improved, shall contain conditions that require mitigation of adverse traffic effects before <br /> <br /> occupancy of the proiect is permitted, or that occupancy be delayed until the level of <br /> service has reached the acceptable level and is no longer proiected to be worse than the <br /> acceptable level. <br /> (2) Where the LOS deficiency is due to roadway or intersection deficiencies in <br /> the immediate vicinityLthe conditions of zoning shall require local mitigation. Where the <br /> deficiency in LOS is due to insufficient capacity in the arterial or collector roads serving <br /> <br /> the proiect, the conditions of zoning shall require regional miti atg ion. <br /> (fl Mitigation requirements will be deemed satisfied when: <br /> (1) a public agency has committed funds for regional mitigation that will remove <br /> <br /> the LOS deficiency. In the case of the State, commitment of funds means that the <br /> Governor has released funds to complete the improvement. In the case of the County, <br /> <br /> commitment of funds means that the Council has appropriated funds to complete the <br /> <br /> improvement; or <br /> 4 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.