Laserfiche WebLink
<br /> My name is Keith Kato, I am the Executive Director of the Hawaii Island Community <br /> <br /> Development Corporation, a SOlc3 non-profit corporation whose mission is to provide <br /> affordable housing for low and moderate income residents of the island of Hawaii. <br /> I am here today to testify on Bill 151 relating to floodways. <br /> There can be no disagreement that protection from flooding is a desirable outcome and <br /> that there are various means of protection each of which comes with its own costs. <br /> Two areas aze of particulaz concern in Bill 151. First, is the requirement that finished <br /> floors be at least 1 foot above the adjacent grade. This requirement will make <br /> compliance with the ADA requirements more difficult and would be detrimental to our <br /> senior rental complexes. <br /> For example, our Kailua-Kona Hualalai Elderly Phase 3 project would have to have <br /> steeper entry walks to meet the higher floor elevations. This would require hand rails <br /> along the walkways due to their steepness. The costs of the handrails would have been <br /> $90,000 for the thirty units. We had this priced out. Since the construction costs were <br /> already high this added expense would require reductions elsewhere, most likely <br /> eliminating ceiling fans, outdoor seating benches, and some trees and shrubs from our <br /> landscaping. <br /> The unfortunate part is that the raising the floor elevation also makes it more difficult for <br /> our seniors to get into their units and does not solve any problems since the entire <br /> property is graded to prevent water from entering the units to begin with. We would be <br /> implementing a solution for which we do not have a problem. <br /> As to stipulating a 25 year intensity storm for drainage calculations, let's looks at an <br /> example. We aze planning a 24 unit subdivision in North Kohala for our self help <br /> builders. Our engineer has designed the project based on the standazd 10 year intensity <br /> flood requirements and re-analyzed it incorporating the proposed 25 year intensity <br /> requirement. The difference is significant. The additional drainage facilities would <br /> increase the costs by roughly $70,000, as much as the infrastructure cost of an additional <br /> lot. A solution offering better flood protection would be to dispose of the run-off into the <br /> adjacent gulch. <br /> These costs are particulaz to this subdivision in North Kohala. Other subdivisions in <br /> other locations will have different costs depending on the general intensity of rainfall, the <br /> porosity of the ground, and the difficulty of construction. <br /> hi general this will mean higher costs in high rainfall areas and higher costs in azeas with <br /> dirt due to its slow percolation. This points to the Hamakua coast, from the Wailuku <br /> River to Upolu Point as being significantly impacted by the proposed change. <br /> For windward areas on Mauna Loa flows, from Hilo to Kumukahi to Volcano it also <br /> means higher costs due to the high rainfall and rocky ground. <br /> 598.5 <br /> Ref. Ta rtl~t; <br /> Ref. Dote. 9ppj <br /> <br />