Laserfiche WebLink
<br /> <br /> 3 <br /> <br /> <br /> <br /> Kealakekua Development Corporation to the Department of Water Supply in a letter to <br /> the Manager of the Department of Water Supply on May 14, 1993 for consideration by <br /> <br /> the Water Commission. <br /> 27. Sewage Disposal: The project is located above the Underground Injection Control <br /> <br /> (UIC) line and is classified under State regulatory guidelines as a Critical Wastewater <br /> Disposal Area. Under such classification effluent must meet secondary treatment <br /> <br /> standards and conditions set by the State Health Department. A 0.04 MGD <br /> prefabricated package wastewater treatment plant will provide secondary treatment to <br /> <br /> all lots within one quarter mile radius of the source water wells as required by State <br /> <br /> guidelines. The lots not serviced by the sewer system will require State approval to use <br /> individual disposal systems that will most likely be septic systems. The sewer system <br /> <br /> will require the minimum 8" diameter gravity pipes for the collector and trunk lines. <br /> Six inch diameter gravity pipes will be used for branch mains in easements which serve <br /> <br /> 10 lots or less. Six foot wide sewer easements will be provided for branch mains, <br /> collector and trunk lines not located in roadways. The effluent will be disposed of by <br /> <br /> leaching fields. The sewage disposal system will be owned and operated by a private <br /> agency established for this purpose. <br /> <br /> 28. Solid Waste Disposal: The new landfill at Puuanuhulu is expected to be used by the <br /> petitioner for its solid waste disposal. The petitioner will be investigating all possible <br /> <br /> on-site reduction and diversion measures to reduce solid waste in conformance with Act <br /> 324-91 regarding Solid Waste Management. A site may be designated specifically for <br /> <br /> activities such as recycling or composting of greenwaste. The petitioner will identify <br /> <br /> and segregate construction waste and investigate composting or recycling options. <br /> Project refuse will be handled by a private hauler. <br /> <br /> 29. Drainage: The proposed drainage system will provide onsite drainage as well as <br /> protection against increased flood risk to downstream and adjacent properties. The <br /> <br /> regional drainage system will consist of the golf course, open equestrian areas, pastoral <br /> areas, drainageways protected by easements and road culverts. Debris basins are also <br /> <br /> proposed at the upper limits of the project. Within golf course and open pastoral areas, <br /> <br /> -9- <br />