Laserfiche WebLink
UPDATED 12/10/08 <br />^ Construction Engineer, CH2M Hill -Sacramento, California <br />~ Resident Engineer during the development of plans specifications and construction of <br />the Pleasant Grove & Kaseberg Trunk Sewers Construction Project in Roseville, <br />California. Major elements included construction ofthree segments oftrunk sewer <br />lines intended to serve the new Pleasant Grove Wastewater Treatment Plant. Duties <br />included development ofthe project specifications and construction drawings, bid <br />support and construction management. (2000-2001); and <br />i Planning and design ofthe Crazy Horse Landfill Liquids Management System Project. <br />Duties included preparation of bid documents and management of design for a <br />leachate and contaminated groundwater collection and conveyance system (2000). <br />^ Landfill Engineer, Salinas Valley Solid Waste Authority -Monterey County, <br />California <br />Planning, preparation, and evaluation of the "Request for Proposals for Operation of <br />Sanitary Landfill and Transfer Station System -Salinas Valley Solid Waste <br />Authority". Duties included review of request for proposal documents, evaluation of <br />proposals, contract negotiation, and contract administration (2000); <br />~ Planning, design and construction management ofthe Crazy Horse Landfill Material <br />Sorting Facility/Johnson Canyon Landfill Material Sorting Facility/Jolon Road <br />Landfill Material Sorting Facility Projects. Duties included management of design, <br />procurement and construction of recycling facilities at three (3) municipal solid waste <br />landfills (2000); <br />~ Planning, design and construction management ofthe Johnson Canyon Landfill Gas <br />Collection System Design-Build Project. Duties included preparation of bid <br />documents, vendor selection, project management, and operations testing for the <br />design and construction of a landfill gas collection and flare system (2000); <br />i Planning, design and construction management of the Lewis Road Landfill Gas <br />Collection System/Crazy Horse Landfill Gas Collection System Projects. Duties <br />included management of design, procurement and construction of gas extraction wells, <br />conveyance systems, and flare station facilities at two (2) municipal solid waste <br />landfills (1999-2000); and <br />~ Planning, design and construction management of the Johnson Canyon Landfill <br />Leachate Collection System Improvements/Jolon Road Landfill Leachate Collection <br />Tank Projects. Duties included management of the design, procurement and <br />construction of leachate pumps, conveyance lines and above ground collection tanks at <br />two (2) municipal solid waste landfills (1999). <br />PG. 5 of 10 Lono Tyson Resume <br />