My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0098.000 2008-2010
ClerkCouncil
>
Council Records
>
Communications
>
2008-2010
>
COM 0098.000 2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2009 10:50:39 AM
Creation date
1/22/2009 10:35:57 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2008-2010
Communication
0098
Point
000
Author
William Kenoi, Mayor
Communications - Referred To
EMC
Comments
EMC-1: Recommends confirmation of the appointment of Lono Tyson as County of Hawaii Director of the Department of Environmental Management - 02/03/09; Council: EMC-1 adopted; appointment confirmed - 2/19/09
Document Relationships
AGE COUNCIL 02/19/2009 2008-2010
(Related To)
Path:
\Council Records\Agendas\2008-2010\Council
AGE EMC 02/03/2009 2008-2010
(Related To)
Path:
\Council Records\Agendas\2008-2010\Environmental Management Committee (EMC)
REP EMC 001 02/03/2009 2008-2010
(Related To)
Path:
\Council Records\Reports\2008-2010\Environmental Management Committee (EMC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UPDATED 12/10/08 <br />^ Construction Engineer, Bryan A. Stirrat & Associates -Diamond Bar, <br />California <br />~ Resident Engineer during the San Timoteo Sanitary Landfill Storm Drain Construction <br />Project. Major elements included earthworks and installation of36", 48", and 54" <br />reinforced concrete piping. Duties included construction management and <br />construction quality assurance monitoring (199,9); <br />~ Construction Manager during the Milliken Sanitary Landfill Groundwater Treatment <br />System Project. Major elements included installation of mainline and lateral <br />groundwater conveyance piping, electrical conduit, and mechanical equipment for the <br />site's Agency approved Corrective Action Program. Duties included construction <br />management and quality assurance monitoring, and coordination of activities between <br />subcontractors, the designer, the landfill operator, the owner, and various state and <br />local regulatory agencies (1998-1999); <br />~ Resident Engineer during the Prima Deshecha Sanitary Landfill Mass Excavation and <br />Grade Separation Bridge Project, Orange County, California. Duties included <br />construction management and construction quality assurance monitoring (1997); <br />~ Resident Engineer during the Phase I Groundwater Protection Project at the County of <br />Santa Barbara's Tajiguas Landfill, Goleta, California. Major elements included mass <br />excavation and grading; installation of eight-ounce and sixteen-ounce geotextiles; <br />construction of a groundwater collection system; construction of a leachate collection <br />and recovery system; installation ofgeocomposite drainage fabric, geosynthetic clay <br />liner, and 80-mil geomembrane; and construction of miscellaneous drainage <br />improvements. Duties included preparation of construction documents, construction <br />management and construction quality assurance monitoring (1996-1997); <br />~ Resident Engineer during the Cell 1 Development and Leachate Ponds Closure Project <br />at the City of Santa Cruz Landfill, Santa Cruz, California. Major elements included <br />mass excavation and grading; import, processing, and placement of a low permeability <br />soil liner; installation ofeight-ounce and sixteen-ounce geotextiles; construction ofa <br />groundwater collection system; construction ofa leachate collection and recovery <br />system; installation of 80-mil geomembrane; and construction of miscellaneous <br />drainage improvements. The project also included final closure of 11 leachate <br />evaporation ponds requiring selective excavation of approximately 150,000 CY of <br />material, and final closure ofthe landfill's South Slope area. Duties included <br />preparation of construction documents, construction management and construction <br />quality assurance monitoring (1996); <br />~ Construction Inspector during construction of miscellaneous drainage improvements at <br />the County of Orange's Frank R. Bowerman Sanitary Landfill, Orange County, <br />California. Duties included construction quality assurance monitoring (1995); <br />Resident Engineer during the Phase II -Module 2/3 Containment System Project at the <br />City of San Diego's West Miramar Landfill, San Diego, California. Major elements <br />included mass excavation and grading; processing and placement ofa bentonite- <br />PG. 6 of 10 Lono Tyson Resume <br />
The URL can be used to link to this page
Your browser does not support the video tag.