Laserfiche WebLink
UPDATED 12/10/08 <br />amended low permeability soil liner; installation of eight-ounce and sixteen-ounce <br />geotextiles; construction ofa lysimeter collection system; construction ofa leachate <br />collection and recovery system; installation of 60-mil geomembrane; and construction <br />of miscellaneous drainage improvements. Duties included prepazation ofconstruction <br />documents, construction management and construction quality assurance monitoring <br />(1994-1995); <br />~ Resident Engineer during the Phase I Groundwater Protection Project at the City of <br />Salinas's Crazy Horse Landfill, Salinas, California. Major elements included mass <br />excavation and grading; processing and placement of a bentonite-amended low <br />permeability soil liner; installation of eight-ounce and sixteen-ounce geotextiles; <br />construction of a groundwater collection system; construction of a leachate collection <br />and recovery system; installation of 80-mil geomembrane; and construction of <br />miscellaneous drainage improvements. Duties included preparation ofconstruction <br />documents, construction management and construction quality assurance monitoring <br />(] 993-1994); <br />~ Construction Supervisor during maintenance operations at the Operating Industries, <br />Inc. Landfill Superfund Site, Monterey Park, Califomia. Duties included supervising <br />and assisting field crews in repairing, improving, and maintaining landfill <br />environmental control systems, site access roads, irrigation systems, final cover, <br />system (including subsurface fire suppression and monitoring) and other site <br />infrastructure (1992-1993); and <br />~ Construction Manager during the excavation and concrete construction phase at the <br />Elixir Industries Groundwater Treatment Plant, Carson, California. Duties included <br />construction quality assurance monitoring (1992). <br />PG. 7 of 10 Lono Tyson Resume <br />