My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0362.000 2008-2010
ClerkCouncil
>
Council Records
>
Communications
>
2008-2010
>
COM 0362.000 2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2009 3:24:08 PM
Creation date
5/20/2009 3:24:05 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2008-2010
Communication
0362
Point
000
Author
William P. Kenoi, Mayor
Communications - Referred To
PC
Document Relationships
AGE COUNCIL 07/08/2009 2008-2010
(Related To)
Path:
\Council Records\Agendas\2008-2010\Council
AGE COUNCIL 08/05/2009 2008-2010
(Related To)
Path:
\Council Records\Agendas\2008-2010\Council
AGE COUNCIL 08/19/2009 2008-2010
(Related To)
Path:
\Council Records\Agendas\2008-2010\Council
AGE PC 06/01/2009 2008-2010
(Related To)
Path:
\Council Records\Agendas\2008-2010\Planning Committee (PC)
BIL 087 Draft 01 2008-2010
(Related)
Path:
\Council Records\Bills\2008-2010
BIL 087A Draft 01 2008-2010
(Related To)
Path:
\Council Records\Bills\2008-2010
REP PC 032 06/01/2009 2008-2010
(Related)
Path:
\Council Records\Reports\2008-2010\Planning Committee (PC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> The requested zoning is consistent with the evolving mix of commercial <br /> and industrial land use patterns in the area. <br /> <br /> C. Climate, Soil and Topography <br /> According to the State Commission on Water Resource Management, the <br /> closest rain gauge in this area is the Hilo Airport. The annual median <br /> rainfall for this area is approximately 131 inches. The average daily <br /> temperature ranges from a minimum of 61 degrees to 79 degrees <br /> Fahrenheit. Wind patterns are generally easterly during the day and <br /> westerly during the evenings. <br /> <br /> The property is located approximately 20 feet above mean sea level, and <br /> is fairly level. <br /> <br /> The Natural Resource Conservation Service's Land Study Bureau Overall <br /> Master Productivity Rating designates this site as Keaukaha Series <br /> (rKFD), which is extremely rocky muck; well-drained thin organic soils <br /> overlying pahoehoe lava rock. The runoff is medium and the erosion <br /> hazard is slight. <br /> <br /> The project site is unclassified under the Agricultural Lands of Importance <br /> to the State of Hawaii (ALISH) classification system. This classification <br /> does not recognize this site as being agriculturally important. <br /> <br /> D. Natural Hazards <br /> <br /> 1. Drainage <br /> <br /> The Federal Emergency Management Agency (FEMA) Flood <br /> Insurance Rate map (FIRM) identifies the project area as Zone "X" <br /> (areas outside of the 500-year flood). There are no existing <br /> drainageways on the site. <br /> 2. Volcanic, Earthquake and Tsunami Hazards <br /> <br /> According to the United States Geological Survey maps, the project <br /> site is located within Lava Flow Hazard Zone 3, on a scale of <br /> ascending risks 9 to 1. The entire City of Hilo falls in the Zone 3 <br /> category. The Building Code designates the entire island of Hawaii <br /> Earthquake Zone 4 and contains certain structural requirements to <br /> address the relative seismic hazard. The site is located in the <br /> County of Hawaii Civil Defense Agency's Tsunami Evacuation <br /> Zone. Nonetheless, the Applicants will adhere to any County or <br /> State procedures if required to evacuate. <br /> <br /> <br /> <br /> <br /> -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.