My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 195 Draft 03 1998-2000
ClerkCouncil
>
Council Records
>
Bills
>
1998-2000
>
BIL 195 Draft 03 1998-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2008 9:00:35 PM
Creation date
5/10/2008 5:16:31 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
1998-2000
Bill/Resolution
195
Draft
03
Introducer
Bobby Jean Leithead-Todd, Councilmember Chair, Planning Committee
Referred To
PC
Action 1
Council: Amend Bill 195, Draft 3, to Bill 195, Dr. 4, as circulated - 02/22/01
File Code
ZNG/PN
Document Relationships
AGE COUNCIL 02/22/2001 2000-2002
(Related)
Path:
\Council Records\Agendas\2000-2002\Council
COM 0027.000 2000-2002
(Related To)
Path:
\Council Records\Communications\2000-2002
COM 0027.002 2000-2002
(Related To)
Path:
\Council Records\Communications\2000-2002
COM 0027.004 2000-2002
(Related To)
Path:
\Council Records\Communications\2000-2002
COM 0027.005 2000-2002
(Related To)
Path:
\Council Records\Communications\2000-2002
COM 0027.006 2000-2002
(Related To)
Path:
\Council Records\Communications\2000-2002
COM 0027.007 2000-2002
(Related To)
Path:
\Council Records\Communications\2000-2002
COM 0027.008 2000-2002
(Related To)
Path:
\Council Records\Communications\2000-2002
COM 0027.009 2000-2002
(Related To)
Path:
\Council Records\Communications\2000-2002
COM 0027.010 2000-2002
(Related To)
Path:
\Council Records\Communications\2000-2002
COM 0027.011 2000-2002
(Related To)
Path:
\Council Records\Communications\2000-2002
COM 0027.012 2000-2002
(Related To)
Path:
\Council Records\Communications\2000-2002
COM 0027.013 2000-2002
(Related To)
Path:
\Council Records\Communications\2000-2002
COM 0027.013 2000-2002
(Related)
Path:
\Council Records\Communications\2000-2002
COM 0027.015 2000-2002
(Related To)
Path:
\Council Records\Communications\2000-2002
COM 0619.001 1998-2000
(Related To)
Path:
\Council Records\Communications\1998-2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
road, shall be submitted to the Planning Director for review and approval prior to <br /> the issuance of Final Plan Approval. <br /> H. All roadway(s) within the proposed development shall be constructed to County <br /> dedicable standazds, with curbs, gutter and sidewalk improvements, meeting with <br /> the approval of the Department of Public Works. <br /> I. All accesses and intersection improvements along Volcano Highway shall be <br /> constructed meeting with all requirements and approval of the Department of <br /> Transportation, including the submittal of construction plans. The applicant shall <br /> provide the traffic improvements as recommended in the Traffic Impact Analysis <br /> Report (TIAR) prior to Certificate of Occupancy for any development within the <br /> 32+-acre project azea. <br /> <br /> J. The applicant shall prepare a future roadway circulation plan of the project azea <br /> and surrounding lands between the Keaau-Pahoa Road Extension and Shipman <br /> Business Pazk for approval by the Planning Director, in consultation with the <br /> Department of Public Works and the State Department of Transportation, prior to <br /> the granting of Final Subdivision Approval or Final Plan Approval for any portion <br /> of the project azea, which ever occurs first. Unless otherwise provided herein, <br /> roadways shown on the approved future roadway circulation plan shall be <br /> constructed incrementally with the development of the adjacent properties, except <br /> as provided below. The approved future roadway circulation network shall be <br /> incorporated as part of the Keaau Zone Map, as appropriate. <br /> K. The applicant shall construct a connector road ("Connector Road 1 between the <br /> Shipman Business Park and the Project azea (Phase I), as shown on Exhibit "[A] <br /> B" attached hereto. This roadway shall connect Melekahiwa Street and the <br /> proposed Road A, and shall be developed in two stages. The effective date of <br /> -4- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.