zoning shall occur upon the completion of construction or acceptance of financial <br /> assurance thereof, whichever occurs first, for the first stage of Connector Road I. <br /> The first stage shall consist of a preliminary vehicular access (hereinafter defined <br /> as road improvements constructed to non-dedicable standazds meeting with the <br /> safety and design requirements of the Department of Public Works). Construction <br /> of the first stage shall be completed prior to the issuance of the County's approval <br /> of occupancy for any portion of the Project Area. The second stage shall consist <br /> of upgrading the preliminazy vehicular access to dedicable standards, meeting <br /> with the approval of the Depaztment of Public Works, and which shall be <br /> constructed concurrently with the development of the lands immediately fronting <br /> Connector Road I. The portion of the Connector Road I through TMK: 1-6-146: <br /> 017 shall be developed consistent with the existing roadway standazds within the <br /> Shipman Business Pazk. The remainder of the road from the Shipman Business <br /> Pazk boundary to Road A shall include curb, gutter, and sidewalk improvements. <br /> L. The applicant shall construct a minimum eight-foot wide pedestrian bike path <br /> within a minimum twelve-foot wide right-of--way from the underpass on the <br /> Volcano Highway to the project azea in general conformance with the alignment <br /> shown on Exhibit "[A] B". The pedestrian bike path shall be completed and <br /> available for use prior to the issuance of the County's approval for occupancy of <br /> any portion of the project area. <br /> <br /> M. The applicant shall construct a second connector road ("Connector Road 2"), <br /> meeting with the approval of the Depaztment of Public Works, between <br /> Melekahiwa Street/Road A and the Keaau-Pahoa Road Extension prior to the <br /> County's issuance of the approval of occupancy for any development within the <br /> Keaau Gateway Project Area Phase II, as shown on Exhibit "[A] B" attached <br /> hereto. Final design including prepazation of construction drawings for <br /> Connection Road 2, shall be financially assured as part of final subdivision <br /> -5- <br /> <br />