Laserfiche WebLink
occur upon the completion of construction or ar.ceptance of financial assurance <br /> thereat, by band or other means meeting wrth the approval of the director. <br /> whichever occurs first, for [he first stage of Connector Road t The first stage <br /> shall consist of a preliminary vehicular access (hereinafter defined as road <br /> improvements constructed to non-dedicable standards meeung with the safety and <br /> design requirements of the Department of Public Works) Cbnstructron of the <br /> first stage shall be completed pnor to the issuance of the County~s approval of <br /> occupancy for an.' portion of the Pro~rct Area The second stage shall consist of <br /> upgrading the prrhmmarv vehicular access to dedicable standards. meeung with <br /> the approval of the Department of Public «'orks and which shall be constructed <br /> concurrently wrth the development of the lands immedia[el~ tronune Comtector <br /> Road l The portion of the Connector Road I through TMK I-V-146 017 shall be <br /> developed consistent with the existing roadway standards wnhin the Shipman <br /> Business Park The remainder of the road from the Shipman Business Park <br /> boundary to Road A ,hall include curb, gutter, and sidewalk unprovements <br /> <br /> L The applicant shall construct a minimum eight-foot wide pedestnan;'bike path <br /> within a minimum [woke-toot wide tight-of-way from the underpass on [he <br /> Volcano Highway to [he pro~ec[ area m general conformance wrth the alignment <br /> shown on Exhibit 'B" The pedestrian:%bike path shall be completed and available <br /> for use prior [o the issuance of the Cbunt~ ~s approval for occupancy of and <br /> portwn of [he project area <br /> <br /> ~t The applicant shall construct a second connector road ("Connector Road 2°), <br /> meeting wnh the approval of [he Department of Public Works, between <br /> V1elekahnva Streeh'Road A and the Keaau-Pahoa Road Extension pnor to the <br /> County~s issuance of the approval of occupancy for any development wrthm the <br /> Keaau Gateway Project ,area Phase I1, as shown on Exhibit B" attached hereto <br /> Final design including preparation of construction drawings for [Connection] <br /> <br />