My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0673.000 2008-2010
ClerkCouncil
>
Council Records
>
Communications
>
2008-2010
>
COM 0673.000 2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2010 11:38:24 AM
Creation date
1/11/2010 1:16:01 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2008-2010
Communication
0673
Point
000
Author
William P. Kenoi, Mayor
Communications - Referred To
PC
Document Relationships
AGE COUNCIL 02/18/2010 2008-2010
(Related To)
Path:
\Council Records\Agendas\2008-2010\Council
AGE COUNCIL 03/03/2010 2008-2010
(Related To)
Path:
\Council Records\Agendas\2008-2010\Council
AGE PC 02/02/2010 2008-2010
(Message)
Path:
\Council Records\Agendas\2008-2010\Planning Committee (PC)
BIL 197 Draft 01 2008-2010
(Related)
Path:
\Council Records\Bills\2008-2010
REP PC 065 02/02/2010 2008-2010
(Related To)
Path:
\Council Records\Reports\2008-2010\Planning Committee (PC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />COUNTY ENVIRONMENTAL REPORT <br />COUNTY REZONING REQUEST (A-5a to FA-2a) <br />AMENDMENT TO SPECIAL PERMIT NO. 842 <br />HAWAII BREWERY DEVELOPMENT CO. INC. <br />KEAAU, PUNA, HAWArI <br />TAX MAP KEY: (3) 1-6-141: 024 <br /> <br />I. INTRODUCTION <br /> <br />Hawaii Brewery Development Co. Inc. (hereinafter referred to as either <br />"applicant" or "HBDe') applied for and received a Special Permit (SPP <br />842) by the Planning Commission on May 27,1993 to establish a brewery, <br />water, and soft drink bottling facility and related improvements on 14.5+ <br />acres of land. (Exhibit A) Subsequently, a water bottling facility was <br />established on 7+ acres of the original acreage. <br /> <br />Because 'the brewery and soft drink bottling components were not <br />completed, HBDC requested and in a letter, dated December 16; 2003, <br />received a 5-year time extension from the Planning Commission. (Exhibit <br />B) In a letter, dated April 18, 2006, Final Plan Approval was secured for <br />the brewery component from the Planning Director. (Exhibits C and C-1) <br />As will be explained below, neither the brewery nor the soft drink facility <br />has been built as of this date, and as such, another 5-year extension is <br />being requested herein. <br /> <br />The original parcel was also the subject of a rezoning action from A-20a to <br />A-Sa (Ord. No. 0421) that became effective on February 25; 2004. <br />(Exhibit D) This was to enable HBDC to subdivide the water bottling <br />facility from the site of the proposed brewery and other components of this <br />project. HBDC then applied for a 2-lot subdivision, which was <br />subsequently approved by the Planning Director on January 11, 2005. <br />(Exhibit E) <br /> <br />HBDC still wants to proceed with the brewery and soft drink bottling <br />facility. As such, it is seeking this 5-year time extension. Furthermore, the <br />7.8+ acre area is too large for proposed brewery and soft drink bottling <br />facility. HBDC thus wants to have this area subdivided into three lots so <br />that various components of this project could be on each of those lots. In <br />so doing, there would be the potential of having different operators for the <br />brewery and soft drink facility. It should be noted that there is a possibility <br />that the brewery would be split into two components. One would involve a <br />micro-brewery (beer) and the other could possibly be a distilled brewery <br />such as shochu. <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.