My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 270 Draft 01 2008-2010
ClerkCouncil
>
Council Records
>
Bills
>
2008-2010
>
BIL 270 Draft 01 2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2012 9:45:02 AM
Creation date
7/15/2010 8:55:05 AM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2008-2010
Bill/Resolution
270
Draft
01
Introducer
Guy Enriques, Council Member
Referred To
PWIRC
Action 1
PWIRC: Postponed Bill 270 to the call of the Chair - 08/03/10
Action 2
Waived to Council per Comm. 876.3 dated August 16, 2010.
Action 3
Council: Bill 270 amended to Draft 2 - 09/09/10.
Reading Number
1
Reading Date
9/9/2010
Document Relationships
AGE COUNCIL 09/09/2010 2008-2010
(Related To)
Path:
\Council Records\Agendas\2008-2010\Council
AGE PWIRC 08/03/2010 2008-2010
(Related)
Path:
\Council Records\Agendas\2008-2010\Public Works & Intergovernmental Relations Committee (PWIRC)
COM 0876.000 2008-2010
(Related To)
Path:
\Council Records\Communications\2008-2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(b) A fee of $50 shall be assessed upon the requestor or property owner for each courtesy inspection <br /> made. "Courtesy inspection" means a requested inspection wherein no permit has been issued or <br /> for general requirements regarding the health, safety, or welfare of people. <br /> (c) The administrative authority has the authority to waive inspection fees. <br /> Section 5 -38. Reserved. <br /> Section 5 -39. Reserved. <br /> Division 5. Inspections. <br /> Section 5 -40. Inspections. <br /> (a) All construction or work for which a permit is required shall be subject to inspection by the <br /> building official. Approval as a result of an inspection shall not be construed to be an approval of a <br /> violation of the provisions of this code or of any other ordinance. Inspections presuming to give <br /> authority to violate or cancel the provisions of this code or of any other ordinances shall not be <br /> valid. <br /> (b) It shall be the duty of the permit applicant to cause the work to remain accessible and exposed for <br /> inspection purposes. Neither the building official nor the County shall be liable for any expense <br /> entailed in the removal or replacement of any material required to allow inspection. <br /> (c) A survey of the lot may be required by the building official to verify that the structure is located in <br /> accordance with the approved plans. <br /> Section 5 -41. Inspection requests. <br /> (a) It shall be the duty of the person doing the work authorized by a permit to notify the building <br /> official that such work is ready for inspection. The building official may require that every request <br /> for inspection be filed and ready at least forty -eight hours before such inspection is desired. Such <br /> request may be in writing or by telephone at the option of the building official. <br /> (b) It shall be the duty of the person requesting any inspections required by this code to provide access <br /> to and means for proper inspection of such work. <br /> Section 5 -42. Required inspections. <br /> The building official, upon notification from the permit holder or the permit holder's agent, shall <br /> make the following inspection and shall either approve that portion of the construction as completed or <br /> shall notify the permit holder or the permit holder's agent if the same fails to comply with this code: <br /> (1) Footing and foundation inspections shall be made after excavations for footings are <br /> complete and any required reinforcing steel is in place. For concrete foundations, any <br /> required forms shall be in place prior to inspection. Materials for the foundation shall be <br /> on the job, except where concrete is ready mixed in accordance with ASTM C 94, the <br /> concrete need not be on the job. <br /> (2) Concrete slab and under -floor inspections shall be made after in -slab or under -floor <br /> reinforcing steel and building service equipment, conduit, piping accessories and other <br /> ancillary equipment items are in place, but before any concrete is placed or floor <br /> sheathing installed, including the subfloor. <br /> (3) Framing inspections shall be made after the roof deck or sheathing, all framing, <br /> fireblocking and bracing are in place and pipes, chimneys and vents to be concealed are <br /> complete and the rough electrical, plumbing, heating wires, pipes and ducts are approved. <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.