Laserfiche WebLink
(4) Lathing inspections, to be made after all lathing and gypsum board, interior and exterior, <br /> in construction required to be fire- resistive is in place but before any plastering is applied <br /> or before gypsum board joints and fasteners are taped and finished. <br /> Exception: Lath and gypsum board installed in Group R, Division 3 and Group U <br /> Occupancies. <br /> Section 5 -43. Final inspection. <br /> The final inspection shall be made after all work required by the building permit is completed. <br /> Section 5 -44. Special inspections. <br /> For special inspections, see Section 1704 and 1707. <br /> Section 5 -45. Certificate of occupancy. <br /> (a) Certificate Requirement. No building or structure shall be used or occupied, and no change in the <br /> existing occupancy classification of a building or structure or portion thereof shall be made until the <br /> building official has issued a certificate of occupancy therefor as provided herein. Issuance of a <br /> certificate of occupancy shall not be construed as an approval of a violation of the provisions of this <br /> code or of other ordinances of the jurisdiction. <br /> Exception: Group R, Division 3 and Group U occupancies will not be issued a certificate of <br /> occupancy. <br /> (b) Certificate Issuance. After the building official inspects the building or structure and finds no <br /> violations of the provisions of this code or other laws that are enforced by the department of public <br /> works, the building official shall issue a certificate of occupancy that contains the following: <br /> (1) The building permit number. <br /> (2) The address of the structure. <br /> (3) The name and address of the owner. <br /> (4) A description of that portion of the structure for which the certificate is issued. <br /> (5) A statement that the described portion of the structure has been inspected for compliance with <br /> the requirements of this code for the occupancy and division of occupancy and the use for <br /> which the proposed occupancy is classified. <br /> (6) The name of the building official. <br /> (7) The edition of the code under which the permit was issued. <br /> (8) The use and occupancy, in accordance with the provisions of chapter 3. <br /> (9) The type of construction as defined in chapter 6. <br /> (10) The design occupant load. <br /> (11) If an automatic sprinkler system is provided, whether the sprinkler system is required. <br /> (12) Any special stipulations and conditions of the building permit. <br /> (c) Temporary Certificate. The building official is authorized to issue a temporary certificate of <br /> occupancy before the completion of the entire work covered by the permit, provided that such <br /> portion or portions shall be occupied safely. The building official shall set a time period during <br /> which the temporary certificate of occupancy is valid. <br /> (d) Revocation. The building official is authorized to, in writing, suspend or revoke a certificate of <br /> occupancy or completion issued under the provisions of this code wherever the certificate is issued <br /> in error, or on the basis of incorrect information supplied, or where it is determined that the building <br /> or structure or portion thereof is in violation of any ordinance or regulation or any of the provisions <br /> of this code. <br /> 14 <br />