My WebLink
|
Help
|
About
|
Sign Out
Home
RES 215 Draft 01 2010-2012
ClerkCouncil
>
Council Records
>
Resolutions
>
2010-2012
>
RES 215 Draft 01 2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2012 4:27:13 PM
Creation date
1/17/2012 2:10:28 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
RES
Bill/Resolution - Council Term
2010-2012
Bill/Resolution
215
Draft
01
Introducer
Brenda J. Ford, Council Member
Referred To
FC
Action 1
FC-195: Recommends adoption of Res. 215-12, 1/31/12.
Action 2
Council: Adopts Res. 215-12 & FC-195 - 02/15/12
Status
Adopted
Date To Mayor or Adoption Date
2/15/2012
Reading Number
1
Reading Date
2/15/2012
Ayes
8-Blas;Ford;Ikeda;Onishi;Pilago;Smart;Yagong;Yoshimoto
Noes
0
Absent
1-Hoffmann
Excused
0
Document Relationships
AGE COUNCIL 02/15/2012 2010-2012
(Related To)
Path:
\Council Records\Agendas\2010-2012\Council
AGE FC 01/31/2012 2010-2012
(Related)
Path:
\Council Records\Agendas\2010-2012\Finance Committee (FC)
BIL 175 Draft 01 2010-2012
(Related)
Path:
\Council Records\Bills\2010-2012
BIL 175 Draft 01 2010-2012
(Related To)
Path:
\Council Records\Bills\2010-2012
COM 0540.000 2010-2012
(Related)
Path:
\Council Records\Communications\2010-2012
COM 0540.000 2010-2012
(Related To)
Path:
\Council Records\Communications\2010-2012
REP FC 195 01/31/2012 2010-2012
(Related To)
Path:
\Council Records\Reports\2010-2012\Finance Committee (FC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 2. Awarding of Project Funding to Lot Owners <br />This project is designed to incorporate a flexible funding <br />criteria due to the unknown variables in sewer connection <br />grant requests. Unknown variables include the total <br />connection costs and the total financial assistance that is <br />required to connect, because each lot owner's situation is <br />unique. This program is designed to help the neediest first <br />to insure that those lot owners within the Haina Water <br />System's WHPA will receive sewer connection financial <br />assistance. The project will use the COUNTY's sewer <br />connection loan program to prioritize the usage of project <br />funds. For whatever grant amount is received, the funds <br />will be used in the following order: <br />1. Applicants who wish to, but are not approved to <br />participate in the COUNTY's sewer connection loan <br />program will be the first recipients. These applicants <br />are lot owners who applied to two financial <br />institutions and were declined. The COUNTY would have <br />received their applications but are declined to <br />guarantee their bank loan request. If grant funds are <br />insufficient to fully fund the total amount of required <br />financing in this category, then funds will be applied <br />to the least expensive connection first until funds are <br />depleted. This will insure that the maximum number of <br />lots are connected. <br />2. If fund are more than sufficient to finance category 1, <br />then the next category would be those who applied for <br />loans, were declined by the financial institutions, but <br />requested and received the COUNTY's guarantee. These <br />lot owners will be reimbursed for their down payment or <br />the portion that was not financed. If grant funds are <br />limited and all requests in this category cannot be <br />fulfilled, then the lowest amount of down payment will <br />be funded first to insure the maximum amount of <br />hookups. If grant funds are sufficient to fund down <br />payments, then the remainder of the grant funds will be <br />divided equally among loan applicants in this category, <br />but not exceeding their loan amount. <br />3. If funds are more than sufficient to finance category 1 <br />and 2, then the third category would be to equally <br />subsidize those with connection costs regardless of <br />whether they applied for a loan but not exceeding their <br />connection costs. <br />Project grant to any single lot owner shall not exceed <br />$25,000.00. <br />ADM. SERV. OFFICE LOG NO. 12 -044 <br />AG -011 Rev 07/28/2005 <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.