Laserfiche WebLink
"Prior to [ ] issuance of certificate <br />of occupancy for the subject property[, ..,,,ie ever- eeeufs fir- ',] the south <br />side of Kahaopea Street shall be improved and widened with the <br />construction of curb, gutter and sidewalk improvements (with pavement <br />widening and transitions) fronting the subject property between <br />Kanoelehua Avenue and the access road to the subject property meeting <br />with the approval of the Department of Public Works and shall be <br />dedicated to the County upon its request. For the area fronting the subject <br />property between the access road and the eastern boundary, these or other <br />improvements may be required by the Department of Public Works <br />provided that no major drainage structures, such as a bridge or culvert, are <br />required by such improvements." <br />Condition I currently requires that the applicant widen and improve the south side <br />of Kahaopea Street along the property's frontage between Kanoelehua Avenue <br />and the future access road before Final Subdivision Approval or Certificate of <br />Occupancy, whichever occurs first. The amendment would delay the installation <br />of these improvements to Certificate of Occupancy. <br />According to the applicant, the amendment is being requested because the <br />applicant "needs to have amendments to conditions to improve the ability to <br />obtain the construction financing for the improvements. Financing for the <br />Kahaopea Street improvements will be easier to arrange as a part of construction <br />financing for the project with all other improvements rather than as a separate". <br />(P.D. Exhibit 1- Applicant's letters dated October 26, 2011 and supporting <br />documents; P.D. Exhibit 2 — Applicant's letter dated November 17, 2011; <br />P.D. Exhibit 3 — Applicant's letter dated December 30, 2011 <br />5. Current Development Plans: According to the Traffic Impact Analysis Report (TIAR) <br />that was submitted with the application, current plans are to develop the property with <br />approximately 38,000 square feet of general retail space, a gas station with six fuel pumps <br />and convenience store, and an approximately 4,000 square foot fast-food restaurant with <br />-4- <br />