My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0555.002 2010-2012
ClerkCouncil
>
Council Records
>
Communications
>
2010-2012
>
COM 0555.002 2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2021 12:11:43 PM
Creation date
7/17/2012 11:52:10 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2010-2012
Communication
0555
Point
002
Author
Sam Cooper
Communications - Referred To
PC
Document Relationships
REP PC 064 09/05/2012 2010-2012
(Related)
Path:
\Council Records\Reports\2010-2012\Planning Committee (PC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAM COOPER <br /> PO BOX 7730 <br /> HILO,HAWAII 96720 <br /> PHONE/FAX(808)-969-6833 <br /> E-MAIL sammcooper @hawaiiantel.net <br /> March 8,2009 <br /> Mr. Galen M. Kuba <br /> Chief Engineer <br /> County of Hawaii <br /> Department of Public Works <br /> County of Hawaii <br /> Regarding my property at 1605 Kinoole St(TMK2-2-038:018). <br /> The area of my property that was damaged during the Roadside Improvement#STP0100(059) <br /> has not yet been restored to the existing condition the property was in before the project began. <br /> When re-installing my fence I ran string lines to find the property line. I found that my property is still <br /> 12 to 18 inches lower than it was before construction started. <br /> I was told by Alan Simeon and various staff from Isemoto Contracting including Jason that the last phase of <br /> the project was to bring in good soil and place the soil at the bottom of the retaining wall weep hole and <br /> would be graded from said wall to the existing land area.Thus the soil would be graded to give positive <br /> drainage from the wall into my yard. <br /> To date the job is not complete.The soil was never placed to the bottom of the weep holes. It was placed 6 <br /> inches plus under the weep holes.This is one reason why my yard is 12-18 inches lower.When you <br /> purchased the 5 feet of property that also changed the topography. Perhaps that 5 ft was not taken into <br /> consideration when the project was engineered.The fact you shot your elevations without first grubbing the <br /> Chong property also is a factor. <br /> During the excavation phase to try to correct the damage to my property I took some measurements to see <br /> how much material was needed.9-10 truckloads(Black cinder soil mix)from Sanford were required.To <br /> date 3 loads were delivered to my property. <br /> Sink holes are now occurring in my yard. I also noticed a lot of pre-existing soil was mixed in with the <br /> cinder soil mix that was put in the construction area of my property. <br /> My request is for 3 more truckloads of material from Sanford rather than 6 more truckloads of material from <br /> Sanford since my fence is up and trees are planted. <br /> Please contact me to set up an on site meeting.Thank you for the work to date. <br /> Sincerely, <br /> Sam Cooper <br /> cc:Alan Simeon <br />
The URL can be used to link to this page
Your browser does not support the video tag.