Laserfiche WebLink
The Honorable J Yoshimoto, Chairman <br />and Members of the County Council <br />Page 8 <br />2012. Various alternatives were considered (pages 13 and 14 of the application and <br />Appendix C, TIAR), with the recommendation of a roundabout at the corner of Paniolo <br />Avenue and Waikoloa Road. <br />Access to the project site is proposed from Waikoloa Road and Paniolo Avenue. <br />Paniolo Avenue is an 80 -foot wide County collector roadway with two through lanes in <br />each direction fronting the property, and improved with a planter strip, sidewalk and <br />streetlights. Waikoloa Road, a County arterial roadway, has a 120 -foot wide right -of -way <br />with one through lane in each direction. There is no sidewalk along Waikoloa Road <br />fronting the property. <br />The Department of Public Works has offered the following recommendations for <br />roadway improvements (summarized): <br />• Accesses to Waikoloa Road and Paniolo Avenue shall be channelized within the <br />County right -of -way, including, where applicable, left turn lanes and right <br />turn/deceleration lanes and left turn refuge lanes and traffic control measures <br />• Prior to Plan Approval, submit a multi -modal Roadway and Traffic Circulation <br />plan prepared by a licensed civil engineer which addresses the combined access <br />and internal circulation details on plans drawn to scale, for approval by the <br />Planning Director in consultation with the Department of Public Works <br />• Construct, coordinate and cooperate with required roundabout improvements to <br />the intersection of Waikoloa Road with Paniolo Avenue <br />• Any necessary additional right -of -way for improvements to the intersection shall <br />be subdivided from the subject property and dedicated to the County, at no cost <br />to the County, upon request, prior to the issuance of any Certificate of <br />Occupancy <br />• Provide improvements along the frontage of Waikoloa Road similar to the <br />improvements makai of the intersection with Paniolo Avenue fronting <br />Highlands Center, to include pavement widening with concrete curb, gutter and <br />sidewalk, drainage improvements, signs and markings, street lights, and any <br />relocation of utilities, prior to the issuance of a Certificate of Occupancy <br />• Improve the Park Access Road (identified as Easement AE -1) to dedicable <br />standards with concrete curb, gutter and sidewalk, drainage improvements, <br />streetlights, signs and markings and utilities, prior to the issuance of a <br />Certificate of Occupancy <br />