My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0067.000 2012-2014
ClerkCouncil
>
Council Records
>
Communications
>
2012-2014
>
COM 0067.000 2012-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2013 4:30:52 PM
Creation date
1/14/2013 11:09:01 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2012-2014
Communication
0067
Point
000
Author
William P. Kenoi, Mayor (2012-2014)
Communications - Referred To
PC
Document Relationships
AGE COUNCIL 2013/02/06 2012-2014
(Related To)
Path:
\Council Records\Agendas\2012-2014\Council
AGE PC 2013/01/22 2012-2014
(Related)
Path:
\Council Records\Agendas\2012-2014\Planning Committee (PC)
BIL 021 Draft 01 2012-2014
(Related To)
Path:
\Council Records\Bills\2012-2014
REP PC 012 01/22/2013 (2012-2014)
(Related To)
Path:
\Council Records\Reports\2012-2014\Planning Committee (PC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Honorable J Yoshimoto, Chairman <br />and Members of the County Council <br />Page 2 <br />months after a determination of the type of improvements (i.e., signalized or <br />roundabout) is made by the Director of the Department of Public Works. The <br />applicant shall install and dedicate the intersectional improvements required in <br />Condition C prior to receipt of Final Subdivision Approval or sooner in the event <br />the warrants for such installation are justified by the Director of Public Works. In <br />lieu of actual construction of infrastructural improvements herein, the applicant <br />may enter into an agreement with the County to assure the County that the <br />infrastructure improvements will be constructed together with the appropriate <br />bond, surety, or other security deemed acceptable to the Planning Director and the <br />Corporation Counsel. Upon execution of such agreement and /or filing of the <br />security with the County, final subdivision approval for the subject property or <br />portions thereof shall be granted in lieu of the actual construction of required <br />infrastructural improvements. No occupancy permit shall be issued until all of the <br />infrastructure improvements covered by the bond or surety have been constructed <br />and approved by the County." <br />The applicant requests that Condition B be amended as follows: <br />"Final Subdivision Approval for not less than 50 lots shall be secured within five <br />(5) years of this new amendment, provided, however, that Final Subdivision <br />Approval for the entire project shall be secured within ten (10) years of this new <br />amendment." <br />The non - performance is the result of conditions that could not have been <br />foreseen or are beyond the control of the applicant, successors or assigns, and are <br />not the result of their fault or negligence. The applicant states that due to current <br />market conditions, the proposed subdivision cannot be completed in the 5 year period <br />(until September 20, 2012) as stipulated in Ordinance No. 07 127. The project is <br />proposed to be developed in a minimum of eight (8) increments, with 50 lots proposed <br />within five (5) years of this amendment, with a 10 -year completion date for the entire <br />project. <br />Since acquiring the property in 2005, the applicant has shown substantial progress <br />towards the completion of the project, including the completion of an Environmental <br />Impact Statement, and the approval of a petition for a State Land Use Boundary <br />Amendment to the Rural district as required under Condition J of Ordinance 07 127. The <br />required construction plans for the roundabout intersection have been submitted to the <br />Department of Public Works. The plans have not yet been approved, as final subdivision <br />approval is still pending. Tentative subdivision approval was granted on April 5, 2007, <br />
The URL can be used to link to this page
Your browser does not support the video tag.