My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0082.000 2014-2016
ClerkCouncil
>
Council Records
>
Communications
>
2014-2016
>
COM 0082.000 2014-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2019 10:15:07 AM
Creation date
1/22/2015 3:12:59 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2014-2016
Communication
0082
Point
000
Author
Deanna S. Sako, Director of Finance
Communications - Referred To
FC
Document Relationships
BIL 020 Draft 01 2014-2016
(Related)
Path:
\Council Records\Bills\2014-2016
REP FC 007 2015/02/03 (2014-2016)
(Related To)
Path:
\Council Records\Reports\2014-2016\Finance Committee (FC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Form #: B -52 <br />7/18/91 <br />DEPARTMENT OF FINANCE <br />REQUEST FOR COUNCIL ACTION <br />DEPARTMENT: Dept of Environmental Management DATE: <br />STAFF CONTACT: Dora Beck PHONE <br />A. REQUEST: <br />01/12/2015 <br />961 -8513 <br />Request to amend Ordinance 14 -82, Capital Improvement Budget, to include an appropriation for the <br />following project: <br />Hilo Ocean Outfall Assessment and Repair — $ 4,950,000 from General Obligation Bond <br />B. BACKGROUND AND JUSTIFICATION (USE ADDITIONAL SHEETS AS NEEDED): <br />Additional funds are needed for design and construction to allow protection of the outfall at shoreline due to <br />erosion as well as to allow an assessment of the ocean outfall and permanent repairs of joint leakages in <br />accordance with EPA Findings of Violations and Order, Docket No. CWA- 309(a) -14 -005 dated September 18, <br />2014. <br />Protection of the outfall at shoreline is required to address erosion at of protective covering of the outfall at the <br />shoreline in order to ensure stability of the outfall as well as to prevent damage to the outfall during high surf <br />conditions. <br />Assessment of the Hilo Ocean Outfall and repair of leaking joints is required by United States Environmental <br />Protection Agency ( USEPA) Finding of Violation and Order for Compliance, Docket No. CWA- 309(a) -14 -005. <br />While the existing leaks are small, the USEPA has determined that the small leaks constitute discharges at <br />locations which are not authorized by the National Pollutant Discharge Elimination System (NPDES) Permit for <br />the facility, and that as such, the discharges constitute a violation of permit. <br />The Design /Survey costs include costs for the consultant to utilize a Remote Operated Vehicle (ROV) to perform <br />an internal inspection of the outfall (3/4 mile in length) in order to perform the assessment. It is currently <br />anticipated that internal repair methods will be utilized to perform permanent repairs at joint leaks in order to <br />minimize the effects to the environment. <br />A Project Data /Financial Impact Statgrrient is attached. <br />SIGNED: <br />n DATE: 'L <br />Department Head <br />
The URL can be used to link to this page
Your browser does not support the video tag.