Laserfiche WebLink
A. The applicants, successors, or assigns shall be responsible for complying with all <br />of the stated conditions of approval. <br />B. Prior to the issuance of a water commitment by the Department of Water Supply <br />(DWS), the applicant(s) shall submit the anticipated maximum daily water usage <br />calculations as prepared by professional engineer licensed in the State of <br />Hawaii to the DWS. A water commitment deposit shall be paid to the DWS <br />within 180 days from the effective date of this ordinance in accordance with <br />Rule 5 of the Department of Water Supply's Rules and Regulations. The <br />applicant is responsible for maintaining valid water commitments to support the <br />proposed use until such time that required water facilities charges are paid in full. <br />C. The applicant shall construct necessary water system improvements as required by <br />the Department of Water Supply, which may include, but not be limited to <br />installing a larger or additional water meter. <br />D. The applicants shall install a reduced pressure type backflow prevention assembly <br />within five (5) feet of the existing water meter and any additional water meters on <br />private property, which must be inspected and approved by the Department of <br />Water Supply. <br />E. Construction of the proposed commercial development shall be completed within <br />five 5) years from the effective date of this amended ordinance. <br />F. Final Plan Approval No. 2987, issued February 15, 1995, is void. Prior to <br />construction, the applicants, successors or assigns shall secure Final Plan <br />-5- <br />