Laserfiche WebLink
Dru Kanuha, Council Chair <br /> and Members of the County Council <br /> Page 3 <br /> existing facility, which is located on TMK: (3) 2-2-034: 104 in 2013. The new building <br /> is currently meeting BIC's needs to provide space for cold and warehouse storage. <br /> Additionally, past and current economic conditions,both locally and globally, are not <br /> favorable for constructing a new facility at this time. Tourism spending, including <br /> tourism from Japan which is a significant part of BIC's market, continues to be at a level <br /> which does not justify the planned improvements. The applicant further states that they <br /> are committed to building the new production and storage facility when economic <br /> conditions warrant the need for increasing production. <br /> Approval of this request would not be contrary to the General Plan or <br /> Zoning Code nor the original reasons for granting the Change of Zone. There have <br /> not been any significant changes to the General Plan for this area since this request was <br /> originally approved that would affect this project. The properties are zoned CG-20, are <br /> located within the State Land Use Urban District, and are designated High Density Urban <br /> by the General Plan Land Use Pattern Allocation Guide(LUPAG) map. The approval of <br /> this time extension request is not contrary to the General Plan and zoning code, therefore, <br /> the Director recommends retaining the property's existing CG-20 zoning. <br /> Water is available to the project area. Each of the subject parcels is serviced by an <br /> existing 5/8—inch meter limited to an average of 400 gallons per day. The applicant has <br /> also secured a commitment for eight(8) additional units of water at a maximum of 600 <br /> gallons per day(4,800 gallons total). The applicant will be responsible for constructing <br /> necessary water system improvements as required by the which may include,but not be <br /> limited to the installation of a reduced pressure type backflow prevention assembly and <br /> improvements to meet DWS' commercial zoning fire flow standard of 2,000 GPM at the <br /> site for fire protection. In addition, the applicant shall comply with all other applicable <br /> DWS policies and requirements. These requirements will be articulated as a condition of <br /> approval of this Ordinance amendment. <br /> According to the Department of Environmental Management Wastewater <br /> Division, any existing or proposed structures will be required to connect to the public <br /> sewer system. In addition, if required by the Director of DEM, the applicant shall <br /> conduct a sewer study and provide any improvements required based on that study. <br /> These requirements will be articulated as a condition of approval of this Ordinance <br /> amendment. <br />