Laserfiche WebLink
12. Concurrency: Section 25-2-46 of the Zoning Code contains concurrency requirements <br /> for roads, water supply and civil defense sirens that were adopted by the County Council <br /> in 2007.(P.D.Exhibit 7-Section 25-2-26,Zoning Code) <br /> • Roads: A traffic assessment was prepared by SSFM in July 2015 and finalized in <br /> March 2016 for the 58-lot residential development.The assessment used 2003 <br /> traffic counts as the foundation for all level-of-service(LOS)analyses of the two <br /> study intersections: Alii Drive/Lunapule Road and Alii Drive/Royal Poinciana <br /> Drive. The study determined that these intersections currently operate at an <br /> acceptable level of service,but some movements at the Lunapule Road/Ali`i <br /> Drive intersection will operate poorly in 2025 and Royal Poinciana Drive/Ali'i <br /> Drive will operate poorly in 2035. The concurrency requirements state that if an <br /> intersection currently operates at an unacceptable LOS or will within 5 years of <br /> the study,a condition of zoning shall delay occupancy until mitigation is <br /> implemented. Since,according to the traffic assessment, these intersections will <br /> operate at an acceptable LOS through 2025,no mitigation is immediately required <br /> and the development can proceed and be occupied without delay. <br /> • Water The Department of Water Supply has confirmed that 61 units of water are <br /> available to the property,which is sufficient to provide water for the proposed 58- <br /> lot residential development. The applicant's water commitment payment is <br /> current. <br /> • Civil Defense Sirens:The applicant will install an Emergency Outdoor Warning <br /> Siren as required by Condition T of the ordinance. <br /> 13. Fair Share: For approximately the past 30 years,the Planning Department has been <br /> responsible for collecting fair share payments from landowners when the County Council <br /> includes a fair share condition in a rezone ordinance. The"trigger"for collection of <br /> payment is typically Final Subdivision Approval for single-family residential lots and <br /> Final Plan Approval for multi-family residential units, such as apartments or townhouses. <br /> Once Final Subdivision Approval and/or Final Plan Approval are issued the developer <br /> may sell off the lots and units to new owners. These current"triggers"were specifically <br /> -6- <br />