Laserfiche WebLink
and adjustment of the Department of Water Supply's water system facilities, <br />should they be necessary, shall take into consideration the future road widening <br />strip along Kilauea Avenue. <br />E. Should the applicant, successors or assigns develop a land use which the Planning <br />Department, in consultation with the Department of Public Works, determines <br />will generate over 50 peak hour trips, a Traffic Impact Analysis Report (TIAR) <br />shall be submitted for review and approval by the Department of Public Works <br />prior to Final Plan Approval. The applicant shall implement, when required by <br />the Department of Public Works, at no cost to the County, any transportation <br />system improvements to Kilauea Avenue that may be deemed necessary by the <br />Department of Public Works. <br />F. A ten (10) foot wide future road widening strip along the property's Kilauea <br />Avenue frontage shall be subdivided and dedicated, at no cost to the County, <br />when required by the Department of Public Works. The applicant shall provide <br />their pro -rata share for the construction of full improvements to the entire property <br />frontage along Kilauea Avenue consisting of, but not limited to, pavement <br />widening with concrete curb, gutter and sidewalk, drainage improvements and any <br />required utility relocation, meeting the approval of the Department of Public <br />Works (DPW). This pro -rata share for roadway improvements specified in this <br />condition shall be determined by the DPW and shall become due and payable to <br />the County of Hawaii within six (6) months from the date that formal notice is <br />served upon the applicant, its successors or assigns by the DPW regarding a <br />program for the installation of curb, gutter and sidewalk improvements along the <br />frontage of Kilauea Avenue in proximity to the subject property. <br />51 <br />