Laserfiche WebLink
Valerie Poindexter, Council Chair <br /> and Members of the County Council <br /> Page 3 <br /> Puna Community Development Plan by providing future employment opportunities and <br /> improved living standards and stimulating the development and expansion of economic <br /> activities. <br /> The Urban classification conforms to the standard that the development is <br /> within reasonable proximity to centers of trading and employment and to basic <br /> services such as schools, police and fire protection, transportation systems and <br /> water. Currently, the roads and County water system in the area to not meet industrial <br /> zoning and urban standards. However, conditions of the Change of Zone approval will <br /> require that the applicant provide an industrial standard roadway within a 60-foot wide <br /> right-of-way, and make improvements to the existing County water system to provide <br /> adequate fire flow to meet the standards for industrial land uses. As municipal sewer is <br /> not available in the area, the applicant will install a wastewater system meeting with the <br /> requirements of the Department of Health. The property is located less than one mile <br /> from the village retail and employment center of Kea'au. Schools and medical, police <br /> and fire services are also located within Kea`au. <br /> Urban Districts shall include lands characterized by"city-like" <br /> concentrations of people, structures, streets, urban level of services and other <br /> related land uses. Several commercial and industrial uses have been established over the <br /> years on surrounding properties and the adjacent properties through Special Permits. <br /> Recently, four properties immediately adjacent to the subject property have received a <br /> Special Permit to establish a brewery, distillery, and water bottling facilities. Between <br /> 2004 and 2016 four State Land Use Boundary Amendments from Agricultural to Urban, <br /> and concurrent requests for Industrial zoning have been approved on lands north of the <br /> Milo Street extension and east of the Kea`au-Pahoa Bypass. As industrial and industrial= <br /> commercial uses already exist in the immediate area, the urbanization of the project site <br /> will not contribute towards scattered urban development. <br /> There are no severe geological or topographical problems which cannot be <br /> properly rectified or which would render the land unusable. The Federal Emergency <br /> Management Agency designates the subject property as Zone "X", areas outside of the <br /> 500-year flood plain and it is not known to be prone to flooding. The property is <br /> relatively flat and is not located in the tsunami inundation area. All project generated <br /> runoff will be disposed of on-site, so as not to impact surrounding properties. Thus, the <br />