Laserfiche WebLink
Valerie Poindexter, Council Chair <br /> and Members of the County Council <br /> Page 7 <br /> The applicant's request is not contrary to the goals of the CDP for this area. The <br /> Puna Community Development Plan (CDP) translates the broad General Plan statements <br /> to specific actions for the Puna district. The Puna district in general lacks industrial areas <br /> suitable for small-scale industry. Nearby Shipman Industrial Park contains large lots that <br /> cater more to large-scale industrial uses. The General Plan Course of Action for Puna <br /> states "identify sites suitable for future industrial activities as the need arises." An action <br /> of the Puna CDP would be achieved by the proposed project in that it would provide <br /> additional lands for commercial and industrial activities that help to provide a wide range <br /> of services and provide jobs for the Puna District. Therefore, the requested General <br /> Industrial zoning is consistent with the General Plan <br /> All utilities and services are available to the site. <br /> In 2007, the Hawai`i County Council requirements in the Zoning Code to ensure <br /> that roads, water systems and civil defense sirens are developed or improved concurrently <br /> with the private development approved through a change of zone. <br /> There is an existing civil defense siren in Shipman Business Park that provides <br /> coverage to the subject property. <br /> The Department of Public Works did not recommend improvements because <br /> access to the property is over private lots with utility and roadway easements. However, <br /> several of the industrial rezonings previously approved along Milo Street required the <br /> applicant to comply with the standards outlined in Standard Details for Public Works <br /> Construction R-33 and R-34. Standard Detail R-33 identifies the street cross section for <br /> business & industrial standards, which is a 60-foot wide right of way with 12-foot wide <br /> paved travel lanes, 8-foot wide paved shoulders and 10-foot wide paved drainage swales. <br /> In a letter dated March 22, 2017, the applicant indicated they will increase the existing <br /> 50-foot wide easement fronting the subject property by ten additional feet and make the <br /> appropriate improvements therein. Thus, the Director is recommending conditions of <br /> approval be included to provide for access to the property meeting industrial road <br /> standards. <br /> Regarding water systems, Section 25-2-46(m) (Concurrency) of the Zoning Code <br /> states "A change of zone application shall not be granted unless: (1) the department of <br /> water supply has determined that it can meet the water requirements of the project and <br /> issue water commitments using its existing system; or(2) specific improvements to the <br />