Laserfiche WebLink
Aaron S.Y. Chung, Council Chair <br /> and Members of the County Council <br /> Page 4 <br /> Despite the preceding, which has delayed this proposed Change of Zone application <br /> since 2017, the Planning Director anticipates near-term amendments to, amongst others, the <br /> concurrency section of the Kona CDP, which would support this proposed rezone. The <br /> proposed CDP amendment would require a landowner applying for rezoning to commit any <br /> right-of-way or improvements of proposed roadways shown on the Official Transportation <br /> Map in a manner that is proportionate to the project's impacts as determined by a traffic <br /> study. Concurrency Zone"D" contains one proposed roadway, the extension of Holoholo <br /> Street-Kealaka`a Street which is located about 3,000 feet to the west of the subject property. <br /> Additionally, the proposed 5-lot subdivision will generate about 5 peak-hour trips per day <br /> which is well under the 50 peak-hour trip trigger for necessitating a traffic study. Thus, the <br /> proposed change of zone is not expected to generate significant traffic impacts which would <br /> require additional road improvements other than those proposed by the applicant for creating <br /> better connectivity between the existing subdivisions, as discussed below. <br /> Policy LU-2.8 of the Kona CDP provides guidance on conventional rezoning in the <br /> Kona Urban Area outside of Transit-Oriented Development (TOD) areas. The CDP <br /> encourages Infill Rezoning, which are defined as rezonings that, "...connect two or more <br /> pre-existing developments. Infill is usually associated with small scale developments of 20 <br /> acres or less that have been leapfrogged by the surrounding or adjacent developments. Infill <br /> rezonings should be conditioned to ensure connectivity to the surrounding developments <br /> and, where applicable, to provide mixed-use opportunities to make the area more <br /> walkable. " The project area is located between the pre-existing Kona Acres Subdivision <br /> and the O`oma Plantation Subdivision and as discussed below, the applicant will construct <br /> the extension of Lalei Place to connect to Hane Street creating a through connection between <br /> the adjacent developments. This connection also conforms to Policy Tran-2.1, which <br /> articulates the Kona CDP road connectivity standards. <br /> All utilities and services are available to the property. Access to the property is <br /> via Lalei Place, which is a County-owned road that has a 20-foot wide pavement and 4-foot <br /> wide paved shoulders within a 50-foot right-of-way. The applicant is proposing to construct <br /> the extension of Lalei Place fronting its property to County dedicable standards and dedicate <br /> it to the County. The extended road would connect with Hane Street, making it possible for <br /> a loop connection to the Mamalahoa Highway. The Department of Public Works, <br /> Engineering Division, supports the applicant's proposal to construct a County dedicable <br /> street connection between Lalei Place and Hane Street, which are both existing County <br /> streets, siting conformance to the Kona CDP's connectivity standards. DPW also stated that <br /> the proposed street alignment and lot line configuration does not appear to afford adequate <br /> driveway approach sight distance for the mauka lots (inside the curve). DPW offered <br /> mitigation alternatives for the non-conforming sight distance with the proposed alignment, <br />