Laserfiche WebLink
• Condition D: (Increase Maximum Residential Units from 518 to 700) <br /> • Condition E (Reduce Maximum Commercial Area from 480,000 to 420,000 <br /> square feet) <br /> • Condition I (Modify Master Plan Amendment Process) <br /> • Condition N (Delete Underground Utility Requirement) <br /> •. Conditions L (Time Extension for Construction) <br /> • Condition P (Modify Construction/Completion Requirement of Ponahawai Street <br /> Extension) <br /> • Condition Q (Modify Access Requirements) <br /> • Condition R (Modify Curb, Gutter, Sidewalk Requirement) <br /> • Condition KK(Waive Fair Share Requirement for Affordable Housing Units) <br /> • Condition 00 (Administrative Time Extension) <br /> 2. Applicant's Reasons for the Requests: The time extension and condition amendments <br /> are being sought to make the Wailani Project District (WPD) development financially <br /> feasible by reducing some of the infrastructural requirements, allowing options to address <br /> infrastructural requirements, allowing the ability to time the infrastructure improvements <br /> to be concurrent with the actual development the improvements are designed to serve, <br /> and increasing the residential uses while decreasing the commercial components of the <br /> project. <br /> 3. Current Proposed Plan: The applicant has submitted a revised Master Plan dated <br /> December 20, 2018 (refer to P.D. Exhibit 11) showing changes to the original approved <br /> Master Plan dated November 16, 2011. The applicant has not submitted a revised <br /> phasing plan as of the date of this writing. The proposed current plan requests to increase <br /> the maximum number of residential units from 518 to 700 inclusive of affordable housing <br /> units designed to comply with the requirements of HCC, Chapter 11, Article 1,but <br /> deletes the requirement for a maximum of 333 senior housing units. Additionally, the <br /> applicant is proposing to reduce the maximum square footage of the medical office <br /> campus, commercial center and business park uses from 480,000 to 420,000. <br /> Additionally, the applicant is requesting to modify the construction requirements for the <br /> -2- <br />