My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0337.000 2018-2020
ClerkCouncil
>
Council Records
>
Communications
>
2018-2020
>
COM 0337.000 2018-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 10:26:53 AM
Creation date
6/24/2019 12:34:29 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2018-2020
Communication
0337
Point
000
Author
Harry Kim, Mayor
Communications - Referred To
PC
Document Relationships
AGE COUNCIL 2019-07-24 2018-2020
(Related To)
Path:
\Council Records\Agendas\2018-2020\Council
AGE COUNCIL 2019-08-07 2018-2020
(Related)
Path:
\Council Records\Agendas\2018-2020\Council
AGE PC 2019/07/08 2018-2020
(Related To)
Path:
\Council Records\Agendas\2018-2020\Planning Committee (PC)
BIL 085 Draft 01 2018-2020
(Related To)
Path:
\Council Records\Bills\2018-2020
REP PC 026 2019/06/18 2018-2020
(Related)
Path:
\Council Records\Reports\2018-2020\Planning Committee (PC)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aaron S.Y. Chung, Council Chair <br /> and Members of the County Council <br /> County of Hawaii <br /> Page 10 <br /> stamp of the professional engineer who prepared the TZAR.DOT also stated that the site plan <br /> included within the TIAR did not reflect the report's recommendations. Finally, DOT <br /> indicated that no additional access would be permitted from the property to Puainako Street. <br /> Based on the last point,the Director recommends amending Condition G to include language <br /> limiting access to the subject parcel from Puainako Street to a single driveway. <br /> Second, as a standard practice, when a change of zone or any amendments thereto <br /> require a TIAR, the Planning Department relies on agency review (in this case DOT and <br /> DPW) to inform appropriate conditions for roadway improvements to mitigate traffic <br /> impacts.Traffic in this area is known to be problematic and the Director wants to ensure that <br /> the appropriate agencies get ample opportunity to review,affirâ–ºn,and approve the TIAR and <br /> any mitigation recommendations therein. The applicant recently provided the Planning <br /> Department with an updated TIAR dated May 20, 2019, however, with the exception of a <br /> new site plan and a new site access evaluation section describing proposed new striping <br /> treatments for Puainako Street an limitation of access from Puainako Street to a single <br /> driveway(starting on page 52),the TIAR is nearly identical to the report submitted in 2017, <br /> including all of the same traffic data,analyses,and recommendations.Based on the timing of <br /> recent submittal, neither DOT or DPW have had a chance to review and comment on the <br /> TIAR analysis and appropriateness of proposed mitigation measures.Based on the preceding, <br /> the Director does not support the deletion of Condition E as it would eliminate the <br /> opportunity for reviewing agencies to vet and approve the TIAR and require suitable <br /> mitigation measures for identified traffic impacts caused by the project. <br /> Finally, these change of zone amendments do not require the applicant to develop <br /> their currently proposed project. Should AutoZone choose to expand the size of their store <br /> now or in the fixture or should any successor applicant wish to develop a different or larger <br /> project, retaining this condition will ensure that any increased traffic impacts would be <br /> studied, and proposed mitigation of those impacts would be reviewed and approved by <br /> appropriate agencies (State DOT and County DPW). Furthermore, as the project will take <br /> access from both State and County roadways,the Director recommends amending Condition <br /> E to include DPW-Traffic Division as a required review and approving agency. Finally,the <br /> Director recommends adding a stipulation to this condition that the applicant construct any <br /> roadway improvements that may be required by DOT and/or DPW prior to the issuance of <br /> Certificate of Occupancy. <br /> Lastly, to the Planning Director recommends the following addition of a condition and <br /> revisions to several other conditions: <br />
The URL can be used to link to this page
Your browser does not support the video tag.