My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 126 Draft 01 2018-2020
ClerkCouncil
>
Council Records
>
Bills
>
2018-2020
>
BIL 126 Draft 01 2018-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 10:00:45 AM
Creation date
12/2/2019 10:18:15 AM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2018-2020
Bill/Resolution
126
Draft
01
Introducer
Susan L. K. Lee Loy, Council Member
Referred To
PWMTC
Action 1
Council: Bill 126 passes first reading; adopts PWMTC-20 - 1/8/20
Action 2
Council: Bill 126 passes second & final reading - 1/22/20
Status
Adopted
Date To Mayor or Adoption Date
1/30/2020
Reading Number
1
Reading Date
1/8/2020
Ayes
7-Chung, David, Kierkiewicz, Lee Loy, Poindexter, Richards, Villegas
Noes
0
Absent
2-Eoff, Kaneali'i-Kleinfelder,
Excused
0
Reading Number .
2
Reading Date .
1/22/2020
Ayes .
7- David, Eoff, Kierkiewicz, Lee Loy, Poindexter, Richards, Villegas
Noes .
0
Absent .
2-Chung, Kaneali'i-Kleinfelder
Excused .
0
Document Relationships
AGE COUNCIL 2020-01-08 2018-2020
(Related To)
Path:
\Council Records\Agendas\2018-2020\Council
AGE COUNCIL 2020-01-22 2018-2020
(Related To)
Path:
\Council Records\Agendas\2018-2020\Council
AGE PWMTC 2019/12/17 2018-2020
(Related To)
Path:
\Council Records\Agendas\2018-2020\Public Works & Mass Transit Committee (PWMTC)
COM 0646.000 2018-2020
(Related)
Path:
\Council Records\Communications\2018-2020
ORD 2020-010 2018-2020
(Related To)
Path:
\Council Records\Ordinances\2020
REP PWMTC 020 2019/12/17 2018-2020
(Related)
Path:
\Council Records\Reports\2018-2020\Public Works & Mass Transit Committee (PWMTC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exceptions• <br /> Continuous insulation for wood, metal framed, and mass walls are not required <br /> when at least one of the following conditions is met: <br /> 1. Walls have a covering with a reflectance of> 0.64. <br /> 2. Walls have overhangs with a projection factor equal to or greater than 0.3., <br /> The projection factor is the horizontal distance from the surface of the wall <br /> to the farthest most point of the overhang divided by the vertical distance <br /> from the first floor level to the bottom most point of the overhang. <br /> 3. Concrete, CMU, and similar mass walls are 6 inches or greater in <br /> thickness. <br /> The R-value of integral insulation installed in concrete masonry units shall not be <br /> used in determining compliance with Table C402.1.3. <br /> "Mass walls" shall include walls: <br /> 1. Weighing not less than 35 psf(170 kg/m2) of wall surface area. <br /> 2. Weighing not less than 25 psf(120 kg/m 2) of wall surface area where the <br /> material weight is not more than 120 pef(1900 kg/m 3). <br /> 3. Having a heat capacity exceeding 7 Btu/ft2 - OF (144 kJ/m2- K). <br /> 4. Having a heat capacity exceeding 5 BtU/ft2• OF (103 kJ/m2- K), where the <br /> material weight is not more than 120 pcf(1900 kg/M3).,, <br /> 1) Table C402.4 from the International Energy Conservation Code is deleted in its <br /> entirety and replaced with the following: <br /> "TABLE C402.4 <br /> BUILDING ENVELOPE FENESTRATION <br /> MAXIMUM U-FACTOR AND SHGC REQUIREMENTS - <br /> CLIMATE ZONE 1 <br /> CLIMATE ZONE 1 <br /> Vertical fenestration <br /> U-factor <br /> Fixed fenestration 0.50 <br /> Operable fenestration 0.65 <br /> Entrance doors 1.10 <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.