Laserfiche WebLink
<br />Inspections <br /> <br /> Inspection requests must be called  Inspection requests must be done by <br />when ready. Allow up to 2 business the licensed contractor and will be <br />days for a building inspector to call (if accepted via the online portal <br />requested) or acknowledge the (EnerGov), telephone, or fax. <br />request. <br /> Work not ready will require a fee for <br /> Required inspections are dependent an additional inspection. <br />of the type of construction but <br /> All inspection results will be available <br />generally no less than three visits will <br />on the EnerGov system for the <br />be required by the Plumbing, <br />contacts listed on the application. <br />Electrical, and Building Inspectors: <br /> Non-Residential projects will also <br />o Foundation inspections <br />require a Certificate of Occupancy <br />o Framing inspections <br />(C/O). Coordinate this request with <br />o Final inspections <br />the area inspector. <br /> <br />Revisions <br /> <br /> Additions and or alterations of a  Examples of “Revisions” vs. “Permit” <br />project under construction are not can be summarized simply as any <br />considered “Revisions”. Many small change or modification that should be <br />changes throughout the course of reviewed for possible fire, life safety, <br />construction may be addressed by a or structural issues. A new permit will <br />“Revision”. This may be done at any be required when additional area is <br />time or following a request by an proposed; change of use; or added <br />inspector. items that were not provided in the <br />original plans e.g. Garage doors, <br /> A “Revision” package should be <br />laundry, pool or spa, retaining walls, <br />provided in a similar manner to a new <br />solar hot water heater, or lanai <br />application and include a copy of the <br />enclosure. <br />approved permitted drawing along <br />with the proposed work shown. This  As with normal electronic applications, <br />should include a site plan, floor plan, revisions are submitted online and <br />and any additional plans or details routed to the agencies need to review <br />that clarify the change(s). the changes. When completed, the <br />applicant will be notified and available <br />for issuance by printing and <br />submitting the signed plans to the <br />Building Division for processing. <br /> <br />Version 1 5 <br /> <br />