My WebLink
|
Help
|
About
|
Sign Out
Home
Draft Electronic Plan Review 3.6.2020
PublicDocuments
>
Public Works
>
Building Division
>
Forms & Permit Applications
>
Draft Electronic Plan Review 3.6.2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2020 9:12:27 AM
Creation date
12/8/2020 9:12:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Certificate of Occupancy <br />New construction and “Change of Use” permits will require a Certificate of Occupancy <br />(C/O) with the exception of one & two-family homes or townhouses. <br /> <br /> Request the C/O application from the When all agencies have signed the <br />building inspector prior to the application and returned to the <br />completion of the project. Building Inspector, a Certificate of <br />Occupancy will be issued to the <br /> The C/O application will indicate the <br />applicant. <br />owner, tenant (if applicable), project <br />type, construction & occupancy along In the event that minor items remain <br />with permit numbers and mailing to be completed then the applicant <br />addresses and project location. may request a Temporary Certificate <br />of Occupancy (TCO) with a reasonable <br /> The application will also be available <br />timeframe for completion. This may <br />online and may be completed by the <br />be up to six months. <br />applicant for physical signatures by <br />the required agencies. Verify the <br />accuracy with the Building Inspector <br />prior to requesting signatures. <br /> <br /> <br />Version 1 6 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.