My WebLink
|
Help
|
About
|
Sign Out
Home
2007-05-04 TPITTULO
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2007
>
2007-05-04 TPITTULO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 2:17:36 PM
Creation date
6/13/2011 2:17:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
particular direction for some area like this. All right, any further questions for Jeff before the <br />applicant comes forward? All right, could we have the applicant, please. <br />ZELKO:Good morning, Commissioners. Jennifer Zelko on behalf of -. <br />GRAHAM:Id like to swear you in first if I could. Could you all raise your right <br />hands. And do you swear or affirm to tell the truth before the Planning Commission today on <br />this matter? <br />TESTIFIERS:Yes. I do. <br />GRAHAM:Thank you. And go right ahead and give your name and address. <br />ZELKO:Yes. Good morning, Jennifer Zelko on behalf of the applicant, Justin <br />Pittullo.Myaddressis121WaianuenueAvenue,Hilo,Hawaii96720. <br />PITTULLO:Goodafternoon.JustinPittullo,POBox67,Hilo,Hawaii96721. <br />LEELOY:Aloha,goodafternoon,SueLeeLoy.Mailingaddress121Waianuenue <br />Avenue, Hilo. <br />GRAHAM:Thank you, all. And I guess at this point we invite you to make whatever <br />presentation youd like to make to the Commission about your application and your project. <br />ZELKO:Sure. After reviewing the conditions for approval, the one issue was <br />Condition C, it has to do with the water. If you look at how its written theres a requirement for <br />this second 8-inch waterline along Ponahawai Street from the existing 12-inch waterline within <br />Komohana Street, and connect to the existing 8-inch and 6-inch waterlines within Ponahawai <br />Street to obtain this 2,000 gpm. And the way that DWS had originally written the agency <br />comment to us, there was this other alternative provision if the Fire Department would allow for <br />that. And in some of our informal discussion with the Fire Department there are other <br />alternatives, such as an automatic sprinkler system; and so thats what we were proposing. And <br />thats why the language that were proposing is that there are other alternatives, and if the Fire <br />Department would be okay with that wed like to do that. <br />GRAHAM:All right, thank you. So, Jeff, do you have any comment on that or -? <br />DARROW:I was just looking at the Department of Water Supply comment letter, <br />Exhibit 3, and the last sentence on No. 3 appears to be what the applicant is referring to. <br />GRAHAM:So in that regard I think the issue before us is maybe the applicant would <br />prefer we dont be so specific on Item C and that if the water can meet what the Fire Department <br />needs they could be handle in other ways, is what youd prefer? <br />ZELKO:That is correct. <br />GRAHAM:All right. Maybe we can read the Water Departments letter ourselves <br />here for just a second. <br />4EXHIBIT B <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.