Laserfiche WebLink
askingthat this refers specifically to this reciprocal easement agreement that has been, I <br />understand, agreed in principle but not signed between C. Brewer and Kamehameha Schools. <br />That, that being the case and being that I havent seen that agreement, I cant recommend that we <br />change this language to what theyre requesting until weve reviewed, until we have reviewed <br />that agreement, that there be that -. Its possible that we were to agree to it certainly if we saw it. <br />But I dont have it, and so I cant recommend that we change the wording that is in, proposed by <br />us right now to what they are suggesting being the alternate wording. <br />Turning to Condition N, the project district includes an area, I think its 185 acres thats currently <br />owned by the Roman Catholic Church and it sits, its mauka of the Main Cane Haul Road, and it <br />sits right in the middle of the area there. The Roman Catholic Church property at the present <br />time does not have an easement over the Main Cane Haul Road crossing the Bishop Estate <br />property. So we cant go ahead with having more lots created in there or allow that to be <br />subdivided until there is an accessway out of the main, out of the, until there is a good access in <br />andoutofthat,ofthatproperty.SothatswhytherewasConditionNinherethatsaidthe <br />property couldnt be subdivided until there was an easement to the Main Cane Haul Road. <br />Theres, there is a possible way, another way to get out of the property. If you look to the lower <br />part, the tail end there of the property, the very bottom part there, yes, if you, there is a County <br />road that extends to the bottom of that property there. The cane roads though within the parcel <br />dont actually reach that County Road. I cant agree that, I, we can agree that Condition N with <br />the, as theyve written it, with the provision that any other connection has to meet with the <br />approval of the Planning Director in consultation with the Department of Public Works. And the <br />reason is that as it stands now Im not sure that that is a workable connection, that, that you can <br />feasibly build a road that would provide decent access into the area using, using that connection. <br />I havent, I havent examined it myself. <br />The Condition S has to do with the sales price of the lots; and this is an important feature of the <br />proposal. And one of the reasons for the favorable recommendation is there is this land to the <br />people aspect of this proposal that the, that the land is being, would be sold essentially at the <br />developers cost plus the cost of improvements that have to be made, plus a 2 percent profit. I <br />agree with their rewording of Condition S because it, it just more specifies what the costs, what <br />costs are included. And some of these, these are fair costs to include. Escrow and closing costs <br />and commissions are fair costs. Cost to develop and maintain the property, not including <br />developers overhead, thats a fair cost in that aside from just the construction cost of the <br />infrastructure, there will be on-going maintenance cost on the property in the interim between <br />approval and sale to people. And taxes is a legitimate cost to add in. Had they not put this in, I <br />would have considered it as part of the cost covered under Item No. 3. But if they want, I can <br />understand why they would want more, more specific breakdown of the allowable costs. <br />The change of Condition X is, thats okay. I think this came from, the Road B should be, the <br />way he said ‚Bƒ it should be ‚F.ƒ And ‚B, what happens is that Road B turns into Road F, and <br />this relates to the site plan. But the crossing of Moaula Gulch which is a big, big gulch and has <br />to be safely crossed, that takes place on Road F, but after, after Road B changes to Road F on <br />their map. And I know the public doesnt know what, doesnt know these roads by these names. <br />These are labels given to these roads on the site plan. On the site plan that they have, what <br />weve been talking about is the Main Cane Haul road is Road A. Road B is a big paved road that <br />leads mauka from the Main Cane Haul Road and goes up to Moaula Gulch, and theres a ford <br />8 <br /> <br />