Laserfiche WebLink
9) NORTH KONA: <br /> A. JOB NO.2022-1204,HUALALAI DEEPWELL REPAIR: <br /> Chair: Is there any testimony for this item? <br /> This project generally consists of furnishing all labor,materials,tools and equipment necessary to <br /> remove the existing pump,motor, and column assembly; furnish and install submersible pump, <br /> submersible slim-line motor, seal section,motor sensor,power cable, sounding tubes,replacement <br /> gasket for split discharge head, and all appurtenant materials; refurbish existing submersible pump, <br /> submersible slim-line motor, and motor sensor; well rehabilitation; chlorinate the well and pumping <br /> assembly; and complete an efficiency test; in accordance with the specifications. <br /> Bids for this project were opened on February 9, 2023, at 2:30 p.m., and the following are the bid <br /> results: <br /> Bidder Bid Amount <br /> Derrick's Well Drilling and Pump Services, LLC $461,991.00 <br /> ALPHA Inc. $759,811.00 <br /> Beylik/Energetic A JV $955,530.00 <br /> Project Costs: <br /> 1) Low Bidder(Derrick's Well Drilling and Pump Services, LLC) $ 461,991.00 <br /> 2) Contingencies (-10%) $ 46,199.00 <br /> Total Cost: S 508,190.00 <br /> Funding for this project will be from DWS's CIP Budget under Deepwell Pump Replacement. The <br /> contractor will have 90 calendar days for Parts "A"—"C"to complete the well repair with the <br /> Contractor's furnished equipment and 150 calendar days for Part"D"to complete the pumping <br /> assembly refurbishment. The Engineering estimate for this project was $709,720.00. <br /> Well History: <br /> Hualalai Deepwell: <br /> Original Installation: September, 1997 <br /> Repaired: December, 2002 <br /> Repaired: May, 2005 <br /> Repaired: June, 2012 <br /> Repaired: October, 2015 <br /> Repaired: October, 2017 <br /> Repaired: September, 2019 <br /> Repaired: July, 2022 <br /> RECOMMENDATION: It is recommended that the Board award the contract for JOB NO. 2022- <br /> 1204,HUALALAI DEEPWELL REPAIR, to the lowest responsible bidder, Derrick's Well Drilling <br /> and Pump Services,LLC,for their bid amount of$461,991.00,plus $46,991.00 for contingencies,for <br /> a total contract amount of$508,190.00. It is further recommended that either the Chairperson or the <br /> Vice-Chairperson be authorized to sign the contract, subject to review as to form and legality by <br /> Corporation Counsel. <br /> Page 4 of 6 February 28,2023,Water Board Agenda <br />