My WebLink
|
Help
|
About
|
Sign Out
Home
PD Background Report (PL-SPP-2022-000031)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2023
>
2023-04-06 Windward
>
Item #3 Ke'Aloha Lani LLC (formerly Hawai'i Brewery Development Co., Inc.) (PL-SPP-2022-031)
>
PD Background Report (PL-SPP-2022-000031)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2023 12:56:12 PM
Creation date
3/31/2023 12:54:19 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
3/21/2023
Other Parcel Numbers
161410270000; 161410280000
Permit Number
PL-SPP-2022-000031
Parcel Number
161410240000
Description
PD Background Report (PL-SPP-2022-000031)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5. Parks and Recreation <br /> This section is not really applicable, as the project would <br /> have no direct impacts on parks. Nonetheless, there are <br /> existing park facilities in the village of Kea'au. Furthermore, <br /> the site is not listed for any future trails or park related uses. <br /> 6. Energy Sustainability <br /> The applicant intends to utilize solar and photovoltaic system <br /> to help with some of its power needs for the proposed <br /> brewery and related facilities. Other means to reduce <br /> dependency on the conventional fuel source is being <br /> explored. Additionally, the structures would be renovated to <br /> take advantage of wind and sun patterns for both heating <br /> and cooling. <br /> The third theme is Transportation. This theme consists of five <br /> (5) elements, and their relationship to the project follows. <br /> 1. Traffic Demand Management <br /> The project's location would help reduce the flow of both <br /> potential workers for the proposed brewery and related <br /> facilities as well as residents requiring certain services from <br /> traveling outside of the district. In that regard, it would <br /> definitely fulfill two of the major objectives of this theme. <br /> For the bottling facility, the operator intends to encourage its <br /> employees to consider car-pooling to the extent feasible. <br /> 2. Mass Transit <br /> This element is not really applicable. Furthermore, unlike <br /> other areas, it would not be feasible to have bus stops at this <br /> site, given its location away from major transit routes. <br /> 3. Roadway Network <br /> Likewise, the objectives and policies of this element are not <br /> directly pertinent to the project. <br /> 4. Highways <br /> None of the objectives or goals is applicable to this project. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.