Laserfiche WebLink
RODRIGUES:Absolutely, I hoped you would. We, without prejudice to calling <br />our witnesses, are mindful of Commissioner Galdones comment about three minutes, <br />with the exception of one witness which we consider an expert witness, and thats former <br />Councilman Michael Tulang whos here. <br />ALAMEDA:Would you like to call him at this time? <br />RODRIGUES:Pretty much so. I know youre trying to get rid of me, but <br />everybody else should be limited to about three minutes. We can do that, okay? But <br />Mr. Tulang probably will take a little bit longer. Okay? Thank you. <br />ALAMEDA:Question, Commissioner Siracusa? <br />SIRACUSA:Yes, I had a question. In the background report, right at the very <br />beginning,itreferstospecialpermittoallowtheestablishmentofacontractorsbase <br />yard. And Im wondering if, Mr. Miranda is being called a contractor, obviously, and I <br />would like to know if he has an APC license or -? <br />RODRIGUES:You know, thats addressed in the memo; and thats one of the <br />finer points. I wrestled with that. In fact, I wrestled Mr. Miranda and his office manager. <br />I said, ‚What the hell is a contractors yard?ƒ I said ‚Youre not Department of <br />Commerce and Consumer Affairs where you have a contractors license. Why do you <br />have that?ƒ I said ‚Youre a PUC operator. You have a PUC license.ƒ And the answer <br />was, ‚Well, when we went down to the Planning Department to fill out our application, <br />they didnt know how to classify us so they said contractors yard.ƒ And I said, ‚Well, <br />what do you do?ƒ There go the pie chart. ‚What do you do?ƒ Obviously youre PUC <br />regulated, youre not a contractor. When I think of contractor, I think of a base yard with <br />trucks and retail people coming in and buying lumber, and cement bags, and this and that, <br />and this and that. I dont expect to see four tractors and several cattle trailers and a <br />forklift and a dump loader and thats it. I expect to see something about contracting. <br />Thats not whats there. So this contractors yard thing really I think set this thing up on <br />the wrong foot. It is not the contractors yard that you can think of HPM or anybody else, <br />heavy, Willocks for example. Its not it. <br />SIRACUSA:So then youre saying that just by beginning of the background <br />report was a misnomer which doesnt really accurately describe whats on the ground, <br />that its setting a negative tone for the whole application? Is that my understanding of <br />your -? <br />RODRIGUES:Absolutely, I got the assignment from Mr. Miranda the night <br />before the last hearing, which was 30 days ago, and I saw that thing contractors yard, <br />and I didnt even know what to say the next day in front of this Commission. <br />ALAMEDA:Okay. Commissioner McCall? <br />MCCALL:So, Mr. Miranda, you have a PUC license or -? <br />8EXHIBIT B <br /> <br />