My WebLink
|
Help
|
About
|
Sign Out
Home
PD Background Report COH-Parks & Rec (PL-SMA-2023-031 & PL-SSV-2023-003)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2023
>
2023-08-17 Leeward
>
Item #7 County of Hawaii Dept. of Parks & Recreation (PL-SMA-2023-000031)
>
PD Background Report COH-Parks & Rec (PL-SMA-2023-031 & PL-SSV-2023-003)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2023 10:14:35 AM
Creation date
8/10/2023 4:15:25 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/8/2023
Related Permits
PL-SSV-2023-000003
Permit Number
PL-SMA-2023-000031
Parcel Number
890040010000
Description
PD Background Report
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bow Engineering & Development, Inc. <br />Miloli`i Beach Park Accessibility <br />Improvement Project <br />POND <br />r <br />55f II '1 <br />EXIST WE LEACH <br />FIELD 70 RSMN <br />A, <br />EXIST COMFORT <br />STATION TO <br />BE DEMOLISHED t + <br />5� <br />FIST CGURTS 0 <br />i�TO BE <br />RESURFACE} `l <br />• ``'' NEW <br />k <br />W <br />ii Irfi"1�•��Uh, u <br />_5- MEMEN1 <br />rQ jE ULM;UShL) <br />44x FR S1 --4 TO <br />F71LACCD <br />�A7FP Y EM! <br />7 <br />` 1 <br />SMA Application <br />January 24, 2023 <br />I <br />I <br />r 5-41 A 7F Au.'FSSIF. F <br />CON zEIE WALKIN4 <br />f �- S <br />J <br />LXIE' CCMuJNIIY <br />__._-T-1 l G`.4711P.`A R.)V <br />- - - - L _ISW_7 <br />CuML`I7 <br />YJ h':II If 3, <br />4 <br />I <br />T , BOAT <br />TURNAROUND <br />ii AREA <br />g k�, - <br />L IMITS OF NF.YV J -V <br />AC PAVEMEP GRA�Hf+ <br />4 do <br />Figure 1 <br />Alternative 1 Conceptual Site Plan <br />Alternative 2: Alternate Comfort Station Location <br />Alternative 2 would include a new comfort station and new potable water system sited <br />closer to the camp sites (Figure 2). The new comfort station location would require the <br />installation of new septic tank(s) and associated sewer piping, though the existing leach <br />field would be reused. The septic tank and sewer piping would be designed in accordance <br />with the State Department of Health requirements. Under the proposed Alternative 2, the <br />Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.