Laserfiche WebLink
Bow Engineering & Development, Inc.�� <br />Miloli`i Beach Park Accessibility SMA Application <br />Improvement Project January 24, 2023 <br />new potable water system and replacement pavilion would be located within the <br />Shoreline Setback Area, and the pavilion would remain in the flood zone. This alternative <br />was eliminated based on community feedback that the comfort station location closer to <br />the campsites is not desired, and the original location is preferred. <br />POND <br />— 10—FT 'NIOE ACCESSIBLE <br />CCHCRM WALKWAY & <br />DRIVEAELE BEACH ACCESS <br />NEW POTAR—E <br />WATER SYSTEra � <br />NEW SEFTIC TANK AND <br />NEW COFFORT - SEWERUNE TO EXIST <br />5TATION � LEACI- FIELD <br />EXIST I'A'S LEACH <br />FIELD T& RE441 ti GA. <br />il EXIST 00VRTS TO &t <br />RECONSTRUCTED <br />a ° k}d' R Sol <br />kXITcWU`Ak3JL YIAfER <br />SYS1EM TO K <br />REPI ACFD <br />i EXIST COMFORT STATION <br />TO BE OEMCLISHEC <br />EXIST PAVEMENT To K <br />DEMOLISHED <br />EXIST COMMUNITY <br />P.aYIUON TO BE <br />DEMOL15HED <br />RE'LACED <br />LIMITS OF NEW � <br />—�{ AC PAVEMENT <br />kI <br />G.RAPHIC SCALE: <br />40 20 a - 40 sG <br />I <br />Figure 2 <br />Alternative 2 Conceptual Site Plan <br />Page 5 of 6 <br />