Laserfiche WebLink
AECOM I County of Hawaii,Planning Department,Fiscal Year 2024 <br /> F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S 20.EXAMPLE PROJECT KEY NUMBER <br /> QUALIFICATIONS FOR THIS SERVICE CATEGORY <br /> (Present no more than 10 projects, with emphasis on previous City projects. <br /> Complete one Section F for each project.) <br /> 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED <br /> PROFESSIONAL CONSTRUCTION <br /> COH, PEIS for the Addition of Wastewater Services for the Puna District SERVICES (If applicable) <br /> (Puna District, HI) Ongoing N/A <br /> 1111111111111111111K left 23.PROJECT OWNER'S INFORMATION <br /> a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER <br /> Department of Environmental Management <br /> County of Hawaii Kelly Hartman (808)961-8512 <br /> 345 Kekuanao`a Street, Suite 41 <br /> Hilo, HI 96720 <br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS SERVICE CATEGORY(Include scope,size,and cost) <br /> The County of Hawaii Department of Environmental Management Draft and Final PEIS:The Draft PEIS outlines the environmental <br /> (DEM) is evaluating the feasibility and potential sites for wastewater implications of the proposed wastewater services while also addressing <br /> facilities and services within the Puna District.The DEM has chosen the potential effects of the associated facilities.The report incorporates <br /> AECOM to create a Programmatic Environmental Impact Statement a general description and an analysis of the technical,economic,social, <br /> (PEIS)and Wastewater Facility Plan for the proposed integration of cultural,and environmental aspects of various proposed wastewater col- <br /> wastewater services.This$1.8 million project explores the feasibility lection,treatment,and disposal infrastructures within the Project Area. <br /> of delivering community wastewater services to regional town centers, Potential environmental consequences,such as short and long-term ef- <br /> community village centers,neighborhood village centers,and village fects on air quality and groundwater,are reviewed,along with mitigation <br /> centers located within the project area,which is specified by the Puna measures to address these issues.The Final PEIS will be submitted in <br /> Community Development Plan and is approximately 320,000 acres. September 2023 for publication. <br /> Critical issues for Puna District include economic development through Community Outreach: Public participation meetings were conducted <br /> wastewater infrastructure improvements and compliance with the State with program stakeholders.The project team also participated in local <br /> of Hawaii Act 125,mandating the elimination of cesspools contributing outreach activities such as Revitalize Puna. <br /> to groundwater degradation by 2050. Currently,there are approximately <br /> 16,000 cesspools in the Project Area. `AECOM"is responsive, on schedule and a clear communicator.AE- <br /> COM provides a great team. This makes my job easier so I will always <br /> The following reports have been completed and the remaining reports recommend working with Rae and AECOM." <br /> are on schedule. —Kelly Hartman,County of Hawaii <br /> Project Definition: In coordination with the County,a Project Definition <br /> report was created to define the boundaries of the Project Area andrr <br /> further establish the extent of wastewater service opportunities in the <br /> Puna District. <br /> Facility Plan:A Draft Facility Plan was developed for the Puna District, <br /> which provides a road map for implementing potential wastewater man- <br /> agement <br /> alternatives. Integrated wastewater systems(IWS),decentral- <br /> ized,and centralized system alternatives were evaluated based on the <br /> conceptual cost estimate,technical factors,and environmental factors. °yam <br /> One of the alternatives looked at implementing all IWS or decentralized <br /> systems. Different evaluations were done,such as looking at the impact <br /> of the number of small Wastewater Treatment Plants(WWTPs)and <br /> sending Puna's flows to the existing Hilo WWTP.The Final Facility Plan <br /> will be completed by the end of 2023. <br /> Puna District Project Area <br /> 25. FIRMS INVOLVED VNTH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> a. AECOM Technical Services, Inc. Honolulu, HI Prime <br /> b. PBR Hawaii&Associates Honolulu, HI Subconsultant for Public Outreach <br /> Cultural Surveys Hawaii Hilo, HI SubconsultantforArchaeological,Cultural and <br /> c, Historical Assessment <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021)PART I -PAGE F-1 <br />