<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Michelle Sorensen, PE Project Manager a. TOTAL b. WITH CURRENT FIRM
<br />20 8
<br />15. FIRM NAMEAND LOCATION (Cityand State)
<br />Brown and Caldwell, Kamuela, Hawaii
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />BS, Civil Engineering, 1997 Hawaii/Licensed Civil Engineer #17346; Exp 4/30/24
<br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />American Water Works Association (AWWA); Water Environment Federation/Hawaii Water Environment Association (WEF/
<br />HWEA); Engineers & Geoscientists of British Columbia (EGBC)
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />Feasibility Study for East Maui Source Development
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (if applicable)
<br />Maui Island, Hawaii
<br />Ongoing
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑x Check if project performed with current firm
<br />Project Manager. BC is providing the County of Maui with a feasibility study to assess existing capacity, refine future
<br />demand projections and evaluate viable water source alternatives that assures reliable potable water supplyto
<br />accommodate planned growth on the Central and Upcountry water systems.
<br />Total Contract Amount: $500K Client: County of Maui, Dept. of Water Supply, Water Resources and Planning Division
<br />b.
<br />(1) TITLE AND LOCATION (Cityand State)
<br />(2) YEAR COMPLETED
<br />Engineering Services to Design a Wastewater Treatment Collection
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (ifapplicable)
<br />and Disposal System for the Pahala Wastewater Treatment Plant and
<br />Ongoing
<br />Forthcoming
<br />Post -Design, Pahala, Hawaii
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ❑x Check if project performed with current firm
<br />Project Manager. BC is providing engineering services for the closure of large capacity cesspools and construction
<br />of new wastewater infrastructure in Pahala, to meet updated effluent discharge requirements dictated by the USEPA.
<br />BC completed the planning phase, which included a preliminary engineering report, environmental assessment,
<br />regulatory and permit identification, site alternatives evaluation and land acquisition, community outreach, and
<br />conceptual alternatives for the design, construction, and commissioning of the system. While the infrastructure was
<br />originally designed around a natural treatment system to minimize environmental impacts, simplify maintenance
<br />requirements, and achieve reliability, alternative treatment technologies are being evaluated to address additional
<br />constraints related to affordability and unique geology of the area.
<br />Total Contract Amount: $4.3M Client: County of Hawaii, Dept. of Environmental Management
<br />C.
<br />(1)TITLEAND LOCATION (CityandState)
<br />(2) YEAR COMPLETED
<br />Kaunakakai Wastewater Reclamation Facility (WWRF) Facility Plan,
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION(ifapplicable)
<br />Kaunakakai, Hawaii
<br />2022
<br />2022
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑x Check if project performed with current firm
<br />Project Manager. BC developed a facility plan that provided a strategy for increased and reliable capacity for the next
<br />20 years. The facility plan will guide future projects at the Kaunakakai Wastewater Reclamation Facility to continue to
<br />provide needed wastewater treatment service in Kaunakakai, including interim replacement of aging infrastructure at
<br />the current facility and consideration of sea level rise. BC also designed replacement of two existing rotating biological
<br />contactors, with necessary electrical and structural improvements. Bid period assistance, construction period
<br />services, and record documents were also provided.
<br />Total Contract Amount: $419K Client: County of Maui, Dept. of Environmental Management, Wastewater