Laserfiche WebLink
County of Hawaii, Planning Dept. <br />PL.4) Community Planning (Community/Regional Plans, General Plan, Climate Adaptation) <br />Section E <br />Fiscal Year 2023-2024 <br />County of Hawaii, Planning Dept. <br />Architect -Engineer Qualifications <br />E. RESUMES OF KEY PERSONNEL PROPOSED FORTH IS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Michelle Sorensen, PE Project Manager a. TOTAL b. WITH CURRENT FIRM <br />20 8 <br />15. FIRM NAMEAND LOCATION (Cityand State) <br />Brown and Caldwell, Kamuela, Hawaii <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />BS, Civil Engineering, 1997 Hawaii/Licensed Civil Engineer #17346; Exp 4/30/24 <br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />American Water Works Association (AWWA); Water Environment Federation/Hawaii Water Environment Association (WEF/ <br />HWEA); Engineers & Geoscientists of British Columbia (EGBC) <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Feasibility Study for East Maui Source Development <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (if applicable) <br />Maui Island, Hawaii <br />Ongoing <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑x Check if project performed with current firm <br />Project Manager. BC is providing the County of Maui with a feasibility study to assess existing capacity, refine future <br />demand projections and evaluate viable water source alternatives that assures reliable potable water supplyto <br />accommodate planned growth on the Central and Upcountry water systems. <br />Total Contract Amount: $500K Client: County of Maui, Dept. of Water Supply, Water Resources and Planning Division <br />b. <br />(1) TITLE AND LOCATION (Cityand State) <br />(2) YEAR COMPLETED <br />Engineering Services to Design a Wastewater Treatment Collection <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (ifapplicable) <br />and Disposal System for the Pahala Wastewater Treatment Plant and <br />Ongoing <br />Forthcoming <br />Post -Design, Pahala, Hawaii <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ❑x Check if project performed with current firm <br />Project Manager. BC is providing engineering services for the closure of large capacity cesspools and construction <br />of new wastewater infrastructure in Pahala, to meet updated effluent discharge requirements dictated by the USEPA. <br />BC completed the planning phase, which included a preliminary engineering report, environmental assessment, <br />regulatory and permit identification, site alternatives evaluation and land acquisition, community outreach, and <br />conceptual alternatives for the design, construction, and commissioning of the system. While the infrastructure was <br />originally designed around a natural treatment system to minimize environmental impacts, simplify maintenance <br />requirements, and achieve reliability, alternative treatment technologies are being evaluated to address additional <br />constraints related to affordability and unique geology of the area. <br />Total Contract Amount: $4.3M Client: County of Hawaii, Dept. of Environmental Management <br />C. <br />(1)TITLEAND LOCATION (CityandState) <br />(2) YEAR COMPLETED <br />Kaunakakai Wastewater Reclamation Facility (WWRF) Facility Plan, <br />PROFESSIONAL SERVICES <br />CONSTRUCTION(ifapplicable) <br />Kaunakakai, Hawaii <br />2022 <br />2022 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑x Check if project performed with current firm <br />Project Manager. BC developed a facility plan that provided a strategy for increased and reliable capacity for the next <br />20 years. The facility plan will guide future projects at the Kaunakakai Wastewater Reclamation Facility to continue to <br />provide needed wastewater treatment service in Kaunakakai, including interim replacement of aging infrastructure at <br />the current facility and consideration of sea level rise. BC also designed replacement of two existing rotating biological <br />contactors, with necessary electrical and structural improvements. Bid period assistance, construction period <br />services, and record documents were also provided. <br />Total Contract Amount: $419K Client: County of Maui, Dept. of Environmental Management, Wastewater <br />Reclamation Division <br />BrownANoCaldwell STANDARD FORM 330 (REV. 6/2006) : 7 <br />