My WebLink
|
Help
|
About
|
Sign Out
Home
PL-INT-2023-005609 06.28.23 WSP USA INC CAT PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 23-24
>
Planning SOQs
>
PL.05 - Environmental- EA, EIS
>
PL-INT-2023-005609 06.28.23 WSP USA INC CAT PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2023 10:00:07 PM
Creation date
6/30/2023 6:21:55 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/28/2023
Permit Number
PL-INT-2023-005609
Description
WSP USA INC, PROFESSIONAL SERVICES FOR CAT PL.5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
" Si ) GERALD D. ANDRADE, PE, CISEC <br /> Vice President, Civil Engineer <br /> CAREER SUMMARY <br /> Gerald Andrade is a project manager and civil engineer with experience in preparing <br /> Act_ hydrologic analyses,hydraulic models,and scour analyses.His design experience <br /> includes highway design,construction traffic control design,ADA curb ramp design, <br /> traffic signal design,water distribution system design,retaining wall design and deep <br /> foundation design as well as the preparation of plans,specifications,and estimates <br /> (PS&Es).He is also experienced in construction management and inspection for various <br /> project types including curb ramp projects,intersection improvement projects, <br /> pavement reconstruction and rehabilitation projects,roadway widening projects and <br /> bridge construction projects. <br /> PROFESSIONAL EXPERIENCE <br /> 29 years with the firm <br /> — Hana Highway Emergency Culvert Repairs at Waipio Stream(2021),Waipio,Maui: <br /> 29 years total project manager(PM)for the project which consists of the preparation of <br /> environmental documentation under Governor Emergency Proclamation and <br /> Professional qualifications design PS&E package development for the full replacement of a culvert crossing <br /> Professional Engineer under Hana Highway at Milepost 3.Major elements of the project include <br /> Hawaii(#70377),2007 development of a bypass road,temporary traffic control,and design of a precast <br /> concrete box culvert to be constructed utilizing a cut-and-cover approach. <br /> Certified Inspector <br /> Sediment and Erosion — Interstate Route H-1 Safety Improvements Palailai Interchange to Waiawa <br /> Control(CISEC),2070 Overpass,Ewa,Oahu(ongoing):project manager(PM)for the project which <br /> consists of the preparation of environmental documentation and design PS&E <br /> Education package development for the safety improvements along approximately 9 miles of <br /> B.S.,Civil Engineering, Interstate Route H-1.Major elements of the project include shoulder resurfacing, <br /> University of Hawaii, 7994 high friction surface treatments on ramps,rumble strips,striping and drainage <br /> improvements. <br /> Areas of prat*6-p <br /> — Maui Storm Water Management Program,Maui,Hawaii(2019):project manager <br /> Project Management responsible for the development of a Storm Water Management Program for HDOT <br /> Environmental Permitting Maui District's Municipal Separate Storm Sewer System(MS4)permit.Program <br /> elements include the development of a GIS-based Asset Management System, <br /> Civil Engineering Public Involvement and Public Education and Outreach programs,Construction <br /> Hydraulics/Hydrology Site Runoff Control program,Post Construction Storm Water Management <br /> Program(Permanent Best Management Practices),Good Housekeeping Program <br /> Best Management (Street Sweeping,Inlet Cleaning and Maintenance Facilities Management),and an <br /> Practices Illicit Discharge Detection Program. <br /> Geotechnical — Farrington Highway Intersection Improvements at Nanakuli Avenue and Haleakala <br /> Construction Management Avenue,Oahu,Hawaii(on-going):project manager(PM)for the project which <br /> consists of the preparation of an environmental assessment(EA),permitting and <br /> Inspection PS&E package development for a 1 mile widening of Farrington Highway in <br /> Geographic Information Nanakuli.Major elements of the project include utility relocations,sidewalk and <br /> Systems/Asset traffic signal improvements and the relocation of a historic railroad alignment. <br /> Management System — East Kapolei Rail Station Multimodal Access Improvements,Kapolei,Hawaii <br /> (ongoing):deputy project manager responsible for the development of <br /> environmental clearance coordination and design for multimodal access <br /> improvements along Kualakai Parkway in support of the Honolulu Rail <br /> Transportation Project.Major project elements include shared use path design,bus <br /> stop design,street lighting,striping and utility relocation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.