|
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY
<br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED
<br /> Eric M.Lau, P.E. Senior Environmental Engineer a.TOTAL b.WITH CURRENT FIRM
<br /> 19 14
<br /> 14.FIRM NAME AND LOCATION(City and State)
<br /> Element Environmental,LLC,Aiea,Hawaii
<br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> Mstr., Civil/Environmental Engineering, MIT • Professional Engineer, Hawaii- Civil No. 12977
<br /> B.S., Civil/Environmental Engineering, MIT • Certified Asbestos Inspector, HIASB-3198
<br /> B.S., Biology, MIT • Certified Lead Risk Assessor/Inspector, PB-0439
<br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> • OSHA Initial HAZWOPER Training, 40-HR •Construction Safety Hazard Awareness Training for
<br /> • OSHA Refresher Training,8-HR Contractors,40-HR
<br /> • OSHA Construction Safety and Health Training, 30- •Hazardous Waste Site Supervisor Training
<br /> HR •Bloodborne Pathogens, First Aid, CPR,and AED Training
<br /> 18.RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Non-Domestic Wastewater Management Plan,JBPHH, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Oahu,Hawaii Ongoing -
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> E2 evaluated NAVFAC Hawaii's 8,000+ facilities to identify, characterize, and quantify non-domestic
<br /> wastewater discharges to the sanitary sewer system tributary to the NAVFAC Hawaii Wastewater Treatment
<br /> a. Plant (WWTP). Coordinated site visits to and conducted interviews with facility managers of over 750 facilities.
<br /> The inventory of non-domestic wastewater sources collected in this study will be used to determine additional
<br /> non-domestic discharges that should be internally permitted and regulated.The project also includes quarterly
<br /> wastewater sampling efforts to collect both grab and 24-hour composite samples from WWTP influent
<br /> locations on the Hickam Field flight line and Pearl Harbor, as well as effluent samples from the WWTP. Fee:
<br /> $1,154,918. Role:Assistant Project Manager/Senior Environmental Engineer.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Navy Spill Prevention Control and Countermeasure Plan PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Update,JBPHH,Oahu,Hawaii Annually -
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> b. Completed annual SPCC site inspections in accordance with oil pollution prevention guidelines (40 CFR 112)
<br /> for 170 regulating Above Storage Tanks (ASTs) storing petroleum and oil. Conducted inspections of over 174
<br /> ASTs and bulk oil storage areas at NAVFAC Hawaii facilities. Updated the inventory, management, and
<br /> evaluation of the condition of Navy ASTs. E2 has generated annual SPCC Inspection Reports based on inventory
<br /> findings in 2013, and 2015-current.Fee: $143,381.Role: Senior Environmental Engineer.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Waianae Agricultural Park Improvements,Waianae,Oahu, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Hawaii 2017 2018
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> Completed the design of miscellaneous improvements to the drainage system at the Waianae Agricultural Park.
<br /> c' The improvements included slope stabilization of drainage ways, diversion of runoff into an infiltration basin,
<br /> design of overflow protection drainage intakes for the infiltration basin, and repairs to existing concrete
<br /> drainage swales. Responsible for preparation of construction documents (i.e., plans and specifications) and
<br /> services during bidding and construction. The construction plans were completed on an accelerated schedule
<br /> to meet the funding requirements for construction. Fee: $60,000. Role: Senior Environmental Engineer.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Reservoirs 155 and 255 Capacity Study,Kunia,Oahu, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Hawaii 2010 -
<br /> d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> Conducted a study concerning the repair, maintenance, and capacity options for Reservoirs 155 and 225 of the
<br /> Waiahole Ditch Irrigation System for the Agribusiness Development Corporation. Fee: $30,000. Role: Senior
<br /> Environmental Engineer.
<br /> COUNTY OF HAWAII-FY24- PAGE 7
<br />
|