Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY <br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED <br /> Eric M.Lau, P.E. Senior Environmental Engineer a.TOTAL b.WITH CURRENT FIRM <br /> 19 14 <br /> 14.FIRM NAME AND LOCATION(City and State) <br /> Element Environmental,LLC,Aiea,Hawaii <br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> Mstr., Civil/Environmental Engineering, MIT • Professional Engineer, Hawaii- Civil No. 12977 <br /> B.S., Civil/Environmental Engineering, MIT • Certified Asbestos Inspector, HIASB-3198 <br /> B.S., Biology, MIT • Certified Lead Risk Assessor/Inspector, PB-0439 <br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> • OSHA Initial HAZWOPER Training, 40-HR •Construction Safety Hazard Awareness Training for <br /> • OSHA Refresher Training,8-HR Contractors,40-HR <br /> • OSHA Construction Safety and Health Training, 30- •Hazardous Waste Site Supervisor Training <br /> HR •Bloodborne Pathogens, First Aid, CPR,and AED Training <br /> 18.RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Non-Domestic Wastewater Management Plan,JBPHH, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Oahu,Hawaii Ongoing - <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> E2 evaluated NAVFAC Hawaii's 8,000+ facilities to identify, characterize, and quantify non-domestic <br /> wastewater discharges to the sanitary sewer system tributary to the NAVFAC Hawaii Wastewater Treatment <br /> a. Plant (WWTP). Coordinated site visits to and conducted interviews with facility managers of over 750 facilities. <br /> The inventory of non-domestic wastewater sources collected in this study will be used to determine additional <br /> non-domestic discharges that should be internally permitted and regulated.The project also includes quarterly <br /> wastewater sampling efforts to collect both grab and 24-hour composite samples from WWTP influent <br /> locations on the Hickam Field flight line and Pearl Harbor, as well as effluent samples from the WWTP. Fee: <br /> $1,154,918. Role:Assistant Project Manager/Senior Environmental Engineer. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Navy Spill Prevention Control and Countermeasure Plan PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Update,JBPHH,Oahu,Hawaii Annually - <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> b. Completed annual SPCC site inspections in accordance with oil pollution prevention guidelines (40 CFR 112) <br /> for 170 regulating Above Storage Tanks (ASTs) storing petroleum and oil. Conducted inspections of over 174 <br /> ASTs and bulk oil storage areas at NAVFAC Hawaii facilities. Updated the inventory, management, and <br /> evaluation of the condition of Navy ASTs. E2 has generated annual SPCC Inspection Reports based on inventory <br /> findings in 2013, and 2015-current.Fee: $143,381.Role: Senior Environmental Engineer. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Waianae Agricultural Park Improvements,Waianae,Oahu, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Hawaii 2017 2018 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> Completed the design of miscellaneous improvements to the drainage system at the Waianae Agricultural Park. <br /> c' The improvements included slope stabilization of drainage ways, diversion of runoff into an infiltration basin, <br /> design of overflow protection drainage intakes for the infiltration basin, and repairs to existing concrete <br /> drainage swales. Responsible for preparation of construction documents (i.e., plans and specifications) and <br /> services during bidding and construction. The construction plans were completed on an accelerated schedule <br /> to meet the funding requirements for construction. Fee: $60,000. Role: Senior Environmental Engineer. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Reservoirs 155 and 255 Capacity Study,Kunia,Oahu, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Hawaii 2010 - <br /> d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> Conducted a study concerning the repair, maintenance, and capacity options for Reservoirs 155 and 225 of the <br /> Waiahole Ditch Irrigation System for the Agribusiness Development Corporation. Fee: $30,000. Role: Senior <br /> Environmental Engineer. <br /> COUNTY OF HAWAII-FY24- PAGE 7 <br />