Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY <br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED <br /> Steven R.Spengler,Ph.D. Senior Hydrogeologist a.TOTAL b.WITH CURRENT FIRM <br /> 35 17 <br /> 14.FIRM NAME AND LOCATION(City and State) <br /> Element Environmental,LLC,Aiea,Hawaii <br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> Ph.D., Hydrogeology, and Mstr., Geology,University of <br /> Hawaii at Manoa <br /> B.S., Geochemistry, UC Santa Cruz <br /> B.S. Chemistry,UC Riverside <br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> • OSHA Initial HAZWOPER Training, 40-HR •Construction Safety Hazard Awareness Training for <br /> • OSHA Refresher Training,8-HR Contractors,40-HR <br /> • OSHA Construction Safety and Health Training, 30- •Hazardous Waste Site Supervisor Training <br /> HR •Bloodborne Pathogens, First Aid, CPR,and AED Training <br /> 18. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Hydrogeologic Study to Detect Impact of MILCON P-184 PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Reject Water,Diego Garcia,British Indian Ocean Territory 2016 - <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> E2 conducted a hydrogeologic study to evaluate the potential impacts to the water supply aquifer in the <br /> Cantonment Area on Diego Garcia resulting from the disposal of reject water created by the recently <br /> constructed nanofiltration water treatment plant. A temporary injection well was installed roughly 100 feet <br /> a. south of the nanofiltration plant recharge field. A network of 35 nested piezometers was installed in the <br /> vicinity of the temporary injection point and a nine-hour duration injection test was conducted using brackish <br /> water spiked with a bromide tracer. The monitoring data collected during this injection test along with a pump <br /> test conducted on a nearby water supply well was used to calibrate 2D/3D density dependent groundwater <br /> models (SEAWAT) that were used to evaluate the potential for the injected concentrate from the nanofiltration <br /> plant to impact the water quality in the nearby water supply wells located inland of the recharge field within <br /> the Cantonment Area. Fee: $476,304. Role: Project Manager/Senior Hydrogeologist. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kanaha Pond Wildlife Sanctuary Hydrogeologic Study, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Kahului,Maui,Hawaii 2010 - <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> b. E2 conducted a 10-month long hydrogeological investigation to quantify the seasonal relationships between <br /> the various inputs and outputs to the ponds in the refuge. Monitoring included installation of nested <br /> piezometers, a meteorological station, tidal gauging stations, and automated rainfall gauges, and the collection <br /> of sediment cores. Fee: $92,000. Role: Senior Hydrogeologist. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Proposed Seawater Desalination Facility Project,Kalaeloa, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Oahu,Hawaii 2018 - <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> Principal investigator for a large-scale pump test conducted on a 1,600-foot deep basaltic well located in <br /> Kalaeloa proposed for use in a desalination project for the Honolulu Board of Water Supply.The deep well was <br /> pumped for three consecutive days at pump rates of between 520 to 540 gallons per minute and the pumped <br /> c. water was injected into a nearby injection well that was screened 300 feet into the underlying caprock aquifer. <br /> Water quality measurements were made throughout the duration of the pump test for temperature, <br /> conductivity, turbidity, pH, oxygen reducing potential, dissolved oxygen, and silt density index. The drawdown <br /> and tidal efficiency of the basaltic well was determined by installing a CDT probe in the pumping well while the <br /> efficiency of the caprock injection well was determined using a pressure transducer. A total of six water <br /> samples were collected during the duration of the pump test and submitted for analysis for all drinking water <br /> constituents including those listed in Appendix A of HAR Chapter 11-20 as well as secondary standards defined <br /> by the US Environmental Protection Agency.Role: Senior Hydrogeologist. <br /> COUNTY OF HAWAII-FY24- PAGE 6 <br />