My WebLink
|
Help
|
About
|
Sign Out
Home
PL-INT-2023-005630 06.30.23 ELEMENT ENVIRONMENTAL LLC CAT PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 23-24
>
Planning SOQs
>
PL.05 - Environmental- EA, EIS
>
PL-INT-2023-005630 06.30.23 ELEMENT ENVIRONMENTAL LLC CAT PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2023 3:15:00 PM
Creation date
7/5/2023 1:02:07 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/30/2023
Permit Number
PL-INT-2023-005630
Description
ELEMENT ENVIRONMENTAL LLC, PROFESSIONAL SERVICES FOR CAT PL.5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS PROJECT CATEGORY <br /> 19.TITLE AND LOCATION(City and State) 20.YEAR COMPLETED <br /> Phase I and II Environmental Site Assessments,Honouliuli PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Wastewater Treatment Plant,Ewa Beach, Oahu,Hawaii 2016/2017 Ongoing <br /> 21.PROJECT OWNER'S INFORMATION <br /> a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NO. <br /> City and County of Honolulu Ms.Lisa Kimura,P.E. (808) 768-3486 <br /> Department of Design and Construction <br /> 22.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> Project Scope: Element Environmental, LLC (E2) was retained by R.M. Towill v` ' <br /> Corporation (RMTC) to conduct Phase I and II Environmental Site • • <br /> Assessments (ESAs) on one parcel of undeveloped land located at Fort Weaver '.•''''' r 1. <br /> Road and Geiger Road, Ewa Beach, Oahu, Hawaii. The City and County of __ ; <br /> " wra. <br /> Honolulu (CCH), owner and operator of the Honouliuli Wastewater Treatment -,. .. . <br /> Plant (WWTP), acquired the 48-acre parcel of land to expand their secondary - -;, - * <br /> treatment operations. In preparation for the proposed construction, E2 <br /> completed a Phase I ESA in 2016 to identify potential environmental issues , .• �.{ ` r A" , .-', <br /> which may impede construction activities on the newly acquired parcel. ' { " `,. <br /> The Phase II ESA scope of work was performed to evaluate the ' •' <br /> presence/absence and nature of contamination on the site based on relevant - <br /> findings of the Phase I ESA. Phase II ESA activities were also conducted in the s <br /> vicinity of an abandoned Navy fuel line located on the adjacent Honouliuli .. <br /> WWTP site, parallel to Geiger Road, where portions of the abandoned fuel line ``- "' . <br /> will be removed during the construction of a drainage basin. Phase II activities Y - . '` <br /> included surface and subsurface soil sampling and evaluation of stockpiled „,, <br /> soil/debris and a historical landfilled area. The subject property was - ; <br /> historically used for railroad, plantation,and military purposes. An abandoned .0 1, -` <br /> Navy fuel pipeline is present on and/or adjacent to the southeast portion of �"'� <br /> the subject property. A second fuel line runs along the old railroad tracks, Project Highlights: <br /> parallel to the north boundary of the subject property. E2 utilized incremental <br /> Contaminants of concern were identified for the subject and adjacent WWTP sampling methodology to <br /> property based on historical property use and included the following. characterize surface soil at the <br /> • Former sugar cane cultivation - organochlorine (OC1) pesticides and <br /> site. <br /> arsenic. E2 evaluated the nature and <br /> • Former railroad and plantation employee housing, former military use, extent of waste materials <br /> and other former and current structures-chlordane and lead. discovered in the shallow <br /> dump site using an excavator. <br /> • Petroleum pipelines on/adjacent to the site - petroleum-related <br /> constituents and metals. <br /> Cost:$331,100. <br /> • Landfilling and soil/debris stockpiles - volatile and semi-volatile <br /> constituents, pesticides, metals, polychlorinated biphenyls (PCBs), and <br /> asbestos. <br /> • Miscellaneous industrial use - volatile and semi-volatile constituents, <br /> metals,and PCBs. <br /> Soil sample results were compared to the State of Hawaii Department of Health (HDOH) Tier 1 Residential and <br /> Commercial/Industrial environmental action levels (EALs). Based on the Phase II ESA sample results and <br /> observations made during the investigation, E2 concluded the following. <br /> Subject Property: <br /> Lead and arsenic were detected in the surface (lead) in the decision unit (DU-9) (dump site) and near-surface <br /> (arsenic) soils at boring B9 on the subject property at concentrations exceeding HDOH Tier 1 EALs. The dump site <br /> (DU-9) appeared to occupy a large shallow sinkhole. <br /> • Debris was observed mixed with the soil, and included glass and porcelain shards, bottles, basalt rocks, <br /> Oil <br /> COUNTY OF HAWAII-FY24- PAGE 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.