Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS PROJECT CATEGORY <br /> 19.TITLE AND LOCATION(City and State) 20.YEAR COMPLETED <br /> Phase I and II Environmental Site Assessments,Honouliuli PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Wastewater Treatment Plant, Ewa Beach, Oahu,Hawaii 2016/2017 Ongoing <br /> 21. PROJECT OWNER'S INFORMATION <br /> a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NO. <br /> City and County of Honolulu Ms.Lisa Kimura,P.E. (808) 768-3486 <br /> Department of Design and Construction <br /> pots and other household cooking implements,pieces of rusted metal,and wood. <br /> • Petroleum-related analytes were not detected in subsurface soil samples collected from the capillary fringe <br /> in the soil borings located in the vicinity of the petroleum pipeline that runs adjacent to the north boundary <br /> of the subject property. <br /> • None of the tested analytes were detected in soil samples collected from the three soil stockpiles located in <br /> the north-central area of the subject property. This soil can be reused on-site as"clean"fill material. <br /> Adjacent Honouliuli WWTP Site: <br /> • None of the tested analytes were detected in soil samples collected from the soil borings located in the <br /> vicinity of the abandoned Navy fuel pipeline that runs along the south side of the Honouliuli WWTP, <br /> parallel to Geiger Road. <br /> • Petroleum-impacted material is not anticipated to be encountered within the excavation required for the <br /> proposed drainage basin construction. <br /> 23. FIRMS INVOLVED WITH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE <br /> a' Element Environmental,LLC Aiea,HI Subcontractor <br /> (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE <br /> b' R.M. Towill Corporation Honolulu,HI Prime Contractor <br /> sot COUNTY OF HAWAII-FY24- PAGE 35 <br />